My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
R2014-26 AUTHORIZING AN AGREEMENT WITH BAINBRIDGE, GEE, MILANSKI AND ASSOCIATES, INC.
COD
>
City Clerk
>
RESOLUTIONS
>
2014
>
R2014-26 AUTHORIZING AN AGREEMENT WITH BAINBRIDGE, GEE, MILANSKI AND ASSOCIATES, INC.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/30/2015 3:51:53 PM
Creation date
7/30/2015 3:51:49 PM
Metadata
Fields
Template:
Resolution/Ordinance
Res Ord Num
R2014-26
Res Ord Title
AUTHORIZING AN AGREEMENT WITH BAINBRIDGE, GEE, MILANSKI AND ASSOCIATES, INC. FOR CONSTRUCTION ENGINEERING AND RESIDENT INSPECTION SERVICES FOR THE UNION STREET SEWER REHABILITATION
Department
Public Works
Approved Date
4/21/2014
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
48
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Exposed bricks <br /> Capped Connection <br /> RQ--Q-on Pant <br /> s CiU7t1U10 wYt!(rJtfeirn .M; <br /> wai.pirw <br /> �. InWation <br /> Infiltration <br /> Stains <br /> Union Sheet•4S"egg Union street•64"egg <br /> eld p shaped pips <br /> Figure 5. Gushing Infiltration Figure 6. Cap with Infiltration <br /> The Union Street sewer rehabilitation design employs trenchless construction methods that <br /> include lining manholes and installing a cured-in-place lining the length of the sewer. The lining <br /> alternative recommended in the design is Cured In Place Pipe(CIPP). <br /> CIPP lining can be used on nearly any size of pipe. The process involves inflating a felt tube <br /> soaked with resin into the sewer pipe. Once the felt tube has been inflated throughout the length <br /> of pipe, heated water or steam fills the tube and is kept at a high temperature until the resin cures <br /> and hardens to form a new pipe inside of the deteriorated pipe. <br /> Figure 7. Heat curing of felt tube liner. Figure 8. Inserting the liner into the pipe. <br /> The CIPP process has been used with good results by the City in many locations. Figures 8 and <br /> 9 above show cured-in-place lining installation work completed on past City projects. <br /> Page 18 <br />
The URL can be used to link to this page
Your browser does not support the video tag.