My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
R2014-17 APPROPRIATE MOTOR FUEL TAX FUNDS TO PAY CITY'S PORTIONS OF CONSTRUCTION COSTS AND CONSTRUCTION ENGINEERING COSTS
COD
>
City Clerk
>
RESOLUTIONS
>
2014
>
R2014-17 APPROPRIATE MOTOR FUEL TAX FUNDS TO PAY CITY'S PORTIONS OF CONSTRUCTION COSTS AND CONSTRUCTION ENGINEERING COSTS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/27/2017 10:51:00 AM
Creation date
7/30/2015 4:40:44 PM
Metadata
Fields
Template:
Resolution/Ordinance
Res Ord Num
R2014-17
Res Ord Title
APPROPRIATE MOTOR FUEL TAX FUNDS TO PAY CITY'S PORTIONS OF CONSTRUCTION COSTS AND CONSTRUCTION ENGINEERING COSTS FOR THE FRANKLIN STREET STREETSCAPE PROJECT
Department
Public Works
Approved Date
3/17/2014
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
9
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
4. Assist in the preparation of final as-built drawings to document the final condition of the <br /> project. <br /> 5. Other construction engineering assistance as requested by the City. <br /> Funding Breakdown <br /> The City funding source breakdown for the various items detailed on the Local Agency Agreement is <br /> given on Table 1 below. <br /> Table 1. Franklin Streetsca a Project Fundin <br /> ITEP City City Funds Estimated <br /> 1 Type of Work Grant % Source City Cost <br /> 2 Sidewalk and Landscaping 80% 20% MFT $237,351 <br /> 3 Street Lighting 50% 50% MFT $337,615 <br /> 4 Street Improvements 0% 100% MFT $22,850 <br /> 5 Festival Power and Fiber Optic Conduit 0% 100% Bond Fund $114,183 <br /> 6 Construction Engineering (Chastain) 80% 20% MFT $10,000 <br /> 7 Construction Engineering (City) 80% 20% General <br /> Fund $35,075 <br /> 8 Total MFT Eligible Construction Costs $597,816 <br /> 9 Total MFT Eligible Construction Engineering Costs $10,000 <br /> Project Schedule <br /> This project is currently scheduled for an IDOT letting(bid opening) on April 25, 2014. IDOT <br /> generally signs a formal construction contract within 6-8 weeks of the letting, probably the middle to <br /> end of June. Until the contract is signed and a preconstruction meeting is held the planned schedule <br /> will not be known. The contract specifications require the Contractor to be shut down prior to the <br /> Decatur Celebration so it is likely that limited construction, if any, will be conducted prior to the <br /> Celebration. <br /> The project is to be completed by July 2015. All work will be under the control of the Illinois <br /> Department of Transportation. <br /> POTENTIAL OBJECTION: There are no known objections to these resolutions. <br /> INPUT FROM OTHER SOURCES: Illinois Department of Transportation, Chastain & <br /> Associates, LLC. <br /> STAFF REFERENCE: Richard Marley, Public Works Director and Matt Newell, City Engineer. <br /> Richard Marley will be in attendance at the City Council meeting to answer any questions of the <br /> Council on this item. <br /> Page 3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.