My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
R2014-08 ACCEPTING THE BID AND AUTHORIZING CONTRACT FOR OAKLEY SEDIMENT BASIN REHABILITATION & LAKE DECATUR DREDGING
COD
>
City Clerk
>
RESOLUTIONS
>
2014
>
R2014-08 ACCEPTING THE BID AND AUTHORIZING CONTRACT FOR OAKLEY SEDIMENT BASIN REHABILITATION & LAKE DECATUR DREDGING
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/27/2017 10:51:19 AM
Creation date
7/31/2015 9:09:44 AM
Metadata
Fields
Template:
Resolution/Ordinance
Res Ord Num
R2014-08
Res Ord Title
ACCEPTING THE BID AND AUTHORIZING EXECUTION OF CONTRACT FOR OAKLEY SEDIMENT BASIN REHABILITATION & LAKE DECATUR DREDGING BASINS 1 THROUGH 4
Department
Water
Approved Date
2/3/2014
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
375
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
C HASTAIN <br /> &ASSOCIATES LLC 5 N country aub Road 217-429-8800 <br /> CONSULTING ENGINEERS DECATUR,1WN01S 62521 PAX:217-42-1-0398 <br /> i <br /> December 6,2013 <br /> Re: Addendum No. 3 <br /> Lake Decatur Dredging and Oakley Sediment Basin Rehabilitation project <br /> The following information is made a part of this contract per the following instructions and <br /> attachments: <br /> DRAWINGS <br /> Item 1:New Drawing 33-Replaces previous Drawing 33 to replace manhole and storm <br /> sewer outlet drainage system with pipe culvert outlet system. <br /> ' (ATTACHMENT) <br /> ' Item 2: Drawing 38-Removed gabions from Temporary Easements 3 and 4 and replaced <br /> with Stone Dumped Riprap Ditch A4. <br /> (ATTACHMENT) <br /> 1 <br /> Item 3: Drawing 39-Added detail for Riprap Ditch for Fasement 3 and 4. <br /> ' (ATTACHMENT) <br /> Item 4: Drawings 3-5-Issue revised Summary of Quantities and Schedule of Quantities for <br /> ' quantity changes related to Items 1-3 above. <br /> (ATTACHMENTS) <br /> II <br /> Item 5:Drawing 54-Mulch Method 1 will not be used for temporary seeding. Strike <br /> Miscellaneous Note 2. <br /> (ATTACHMENT) <br /> Proiect Manual <br /> ' Item 1: Pages 13-15A of Bid Proposal:A revised Bid Form showing revised pay items and <br /> quantities for revisions to Drawings 33 and 38. <br /> (ATTACHMENT) <br /> ' I I P a g e <br /> i <br />
The URL can be used to link to this page
Your browser does not support the video tag.