My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
R2014-08 ACCEPTING THE BID AND AUTHORIZING CONTRACT FOR OAKLEY SEDIMENT BASIN REHABILITATION & LAKE DECATUR DREDGING
COD
>
City Clerk
>
RESOLUTIONS
>
2014
>
R2014-08 ACCEPTING THE BID AND AUTHORIZING CONTRACT FOR OAKLEY SEDIMENT BASIN REHABILITATION & LAKE DECATUR DREDGING
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/27/2017 10:51:19 AM
Creation date
7/31/2015 9:09:44 AM
Metadata
Fields
Template:
Resolution/Ordinance
Res Ord Num
R2014-08
Res Ord Title
ACCEPTING THE BID AND AUTHORIZING EXECUTION OF CONTRACT FOR OAKLEY SEDIMENT BASIN REHABILITATION & LAKE DECATUR DREDGING BASINS 1 THROUGH 4
Department
Water
Approved Date
2/3/2014
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
375
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
r <br /> ' Addendum No. 3 <br /> Lake Decatur Dredging and Oakley Sediment Basin Rehabilitation project <br /> Page 2 of 2 <br /> ' Additional Information <br /> ' Item 1: The International Union of Operating Engineers Local 965 has stated that the <br /> prevailing wage rates for this project are Highway(HWY)classifications, not Building <br /> (BLD)classifications. <br /> tItem 2: Embankment material for raisin the berms at the Oakley Sediment Basin shall g y ll be <br /> mixed as needed to maintain uniform properties. <br /> ' Item 3: The joints for Storm Sewers Class A T " <br /> � Type 7 36 shall be watertight to eliminate <br /> ' possible exfiltration per Section 542 of the SSRBC. <br /> Item 4: The Du Bois Sangamon property is shown on an attached Exhibit. This is an <br /> ' environmentally sensitive area. The Contractor shall conduct his operations outside of the <br /> limits of this property for the duration of the project.. <br /> Sincerely, <br /> ' CHASTAIN&ASSOCIATES LLC <br /> ' Gregg L.Foltz,P.E. <br /> Project Manager <br /> i <br /> i <br />
The URL can be used to link to this page
Your browser does not support the video tag.