My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
R2014-08 ACCEPTING THE BID AND AUTHORIZING CONTRACT FOR OAKLEY SEDIMENT BASIN REHABILITATION & LAKE DECATUR DREDGING
COD
>
City Clerk
>
RESOLUTIONS
>
2014
>
R2014-08 ACCEPTING THE BID AND AUTHORIZING CONTRACT FOR OAKLEY SEDIMENT BASIN REHABILITATION & LAKE DECATUR DREDGING
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/27/2017 10:51:19 AM
Creation date
7/31/2015 9:09:44 AM
Metadata
Fields
Template:
Resolution/Ordinance
Res Ord Num
R2014-08
Res Ord Title
ACCEPTING THE BID AND AUTHORIZING EXECUTION OF CONTRACT FOR OAKLEY SEDIMENT BASIN REHABILITATION & LAKE DECATUR DREDGING BASINS 1 THROUGH 4
Department
Water
Approved Date
2/3/2014
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
375
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
n <br /> CHASTAIN <br /> &ASSOCIATES LLC 5NCwrMClub Rom 217-429-8800 <br /> CONSULTING ENGINEERS DECATUR ILLWOIS 62521 FAX:217-4210398 <br /> December 10,2013 <br /> Re:Addendum No, 4 <br /> Lake Decatur Dredging and Oakley Sediment Basin Rehabilitation project <br /> The following information is made a part of this contractPe r the followin instructions and <br /> g <br /> attachments: <br /> DRAWINGS <br /> Item 4:Drawings 3 &5-Deleted Storm Sewers Class A 12" and revised Manhole Removal <br /> ' quantity. <br /> (ATTACHMENTS) <br /> Proiect Manual <br /> Item 1: Pages 13-15A of Bid Proposal:A revised Bid Form showing revised pay items and <br /> quantities for revisions to Drawing 3 above. <br /> (ATTACHMENT) <br /> Additional Information <br /> 1. Is bedding required for Stone Dumped Riprap CL A 4 drawing shows it but with IDOT <br /> ' pay item its not required? Bedding.is required for CL A 4 Riprap per section 281 of <br /> the SSRBC. <br /> 2. FillingManhole 5 each <br /> do you have a depth for those and a length of pipe that needs to be <br /> fill I see its incidental to manholes but a length would be helpful ? <br /> Location Manhole ole De th Length Pi (Estimated) <br /> P t Pe(Es ) <br /> 430+58 10.65' 48' <br /> ' 243+17 15.65' 64' <br /> 501+30 16.15' 64' <br /> 517+00 11.45' 50' <br /> 328+03 14.25' 70' <br /> 1 <br /> ' - _ 11Page <br />
The URL can be used to link to this page
Your browser does not support the video tag.