My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2013-23 AMENDING CITY CODE - CHAPTER 65 - WATER MAIN CONNECTION CHARGES
COD
>
City Clerk
>
ORDINANCES
>
2013
>
2013-23 AMENDING CITY CODE - CHAPTER 65 - WATER MAIN CONNECTION CHARGES
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/13/2015 4:02:58 PM
Creation date
8/13/2015 4:02:57 PM
Metadata
Fields
Template:
Resolution/Ordinance
Res Ord Num
2013-23
Res Ord Title
AMENDING CITY CODE - CHAPTER 65 - WATER MAIN CONNECTION CHARGES
Department
Public Works
Approved Date
4/15/2013
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
15
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Table 1 <br /> Water Main Connection Charges established by <br /> Chapter 65 of the Decatur City Code <br /> Construction Date Connectionj Fee per <br /> Lineal Foot of Frontage <br /> Before August 31, 1976 $5.00 <br /> Between August 31, 1976 and June 30, 1986 $7.5� <br /> After June 30, 1986 $11.90 <br /> Connection Fees based on Frontage Foot: The underlying principle for the water main <br /> connection charge is to recover the costs of water main construction to those enefitting from the <br /> water main extension. A public water main is generally found in the public r ht of way and can <br /> be tapped by properties on both sides of the street. A fundamental way to rec over the <br /> construction cost is to charge the customer their proportional share of the im ovements that are <br /> uniquely attributable to the customer, which is the lineal frontage their prope y has to the water <br /> main. <br /> The City of Decatur currently charges per linear foot of lot frontage. As a result, the charges to <br /> connect to the water main are not uniform and can be difficult to calculate fort odd shaped lots. <br /> City staff evaluated the actual cost of water main construction within the dec de of 2000 to 2010. <br /> The approximate cost was $67.95 per lineal foot of water main constructed. ssuming that the <br /> water main serves both sides of a street,the cost would be $33.97 per lineal foot. This should be <br /> the rate charged per frontage foot in order to recover the cost to construct water mains. A review <br /> of connection fees for recent years indicates the average connection fees are approximately <br /> $1,320. Staff surveyed several Illinois cities to determine the connection charge for atypical 1" <br /> " service tap. See Table 2 in Attachment 1. <br /> Connection Fees based on Meter Size: Several communities throughout th state utilize a <br /> connection fee based on meter size. The thought behind an increase with meter size is that those <br /> customers who choose to install a larger meter, have a much greater potential to utilize and <br /> influence the City's resources and infrastructure. Decatur's water main connection fee does not <br /> vary with the size of the connection. A survey of other cities indicates several cities charge <br /> significantly more for larger service taps. A summary of the survey is presen ed in Table 3. <br /> Proposed Connection Fee Rationale: To determine a proposed rate, Staff ed the rate on <br /> what an average lot, with a frontage of 110 feet, would pay at the recovery t of$33.97 per <br /> foot of water main as found in item 2 above. This results in a rate of$3,737 per 1" meter tap. <br /> Staff is proposing straight line proportionality for the size of the meter to thencrease of the <br /> connection charge which would be $3,500 per inch of meter size. A one incl residential, <br /> connection charge would be$3,500. A 1.5 inch meter would have a connection charge of <br /> Page 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.