My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2013-23 AMENDING CITY CODE - CHAPTER 65 - WATER MAIN CONNECTION CHARGES
COD
>
City Clerk
>
ORDINANCES
>
2013
>
2013-23 AMENDING CITY CODE - CHAPTER 65 - WATER MAIN CONNECTION CHARGES
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/13/2015 4:02:58 PM
Creation date
8/13/2015 4:02:57 PM
Metadata
Fields
Template:
Resolution/Ordinance
Res Ord Num
2013-23
Res Ord Title
AMENDING CITY CODE - CHAPTER 65 - WATER MAIN CONNECTION CHARGES
Department
Public Works
Approved Date
4/15/2013
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
15
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
it <br /> $5,250, and a two inch meter would result in a$7,000 connection charge and iso on. The <br /> proposed revision to Chapter 65 of the City Code includes a 50% discount to properties within <br /> the City Corporate Limits at the time of application for water service. <br /> Alternative Price Comparison: City staff found that the cost to construct a drinking water well <br /> for a typical residential use varies between$5,000 and $6,000 in Macon County. The cost of a <br /> well to produce larger amounts of water(if an underlying aquifer is present with adequate <br /> capacity) would be higher. There are few locations with an adequate underlying aquifer that will <br /> produce high volumes of water that could be obtain with a 2"to 3"water main connection. The <br /> proposed water main connection fee would keep the rate below the cost to build a private well. <br /> Connection Fees based on Meter Size: The revisions to City Code Chapter 5 also include a <br /> provision to increase the water connection fee based on the Construction Cos Index every year <br /> during budget preparation. This provision will allow the City to continue to r cover the costs of <br /> water main extensions. <br /> Existing Wells: Unused wells which have not been properly abandoned in accordance with the <br /> requirements of the State of Illinois and the Macon County Health Department are of serious <br /> concern to public health and welfare. The revisions to City Code Chapter 65 include provisions, <br /> as a condition of City water service, that require the property owner to either#bandon the <br /> existing well or inspect the existing well and bring it in compliance with State,of Illinois and <br /> Macon County Health Department requirements. Any well left in service on property will only <br /> be allowed to be used for irrigation purposes. <br /> Redevelopment: In most cases of redevelopment within the City, the property has previously <br /> paid a fee to connect to a City water main. In these situations, no additional water main <br /> connection fees are charged to that property. This past practice will remain tho same. <br /> New Development: If development occurs on a property that is adjacent to aipublic water main <br /> and has not previously paid a water main connection charge, the amended chajrges will apply. <br /> However, many times new development is such that a City of Decatur water rain must be <br /> extended from an existing main to serve the development. The cost to extend the water main is <br /> at the Developer's expense. If the cost to extend the water main exceeds the total amount of the <br /> water main connection charge, no addition connection charge is required. If the cost to extend <br /> the water main is less than the total amount of the water main connection charge, the Developer <br /> must only pay the difference. <br /> In addition, the City Manager presently has the authority to negotiate Development Agreements <br /> and water main connection charges can be included in those negotiations. <br /> SCHEDULE: The increased water main connection fee would take effect on May 1, 2013. <br /> BUDGET/TIME IMPLICATIONS: <br /> i <br /> Budget Impact: Increasing the water main connection fees may reduce the C�ity's non- <br /> reimbursed cost for water main extensions. <br /> Page 3 <br /> I <br />
The URL can be used to link to this page
Your browser does not support the video tag.