Laserfiche WebLink
Figure 7. Damaged beam ends exposed after Figure 8. Pouring the foo ing for the new pier. <br /> removal of their concrete encasement. <br /> ll � <br /> i <br /> i <br /> Figure 9. Forming the new columns. Figure 10. Forming the nOw pier cap that will <br /> support the beams. <br /> �a <br /> Figure 11. The new pier is poured and forms Figure 12. The concrete 4eck over the piers is <br /> are being removed. replaced. <br /> Page 5 <br />