Appendix B <br /> Brief Photo ra hic Overview <br /> a <br /> a- <br /> tK, <br /> Figure 1. Installing micro-piling on the west Figure 2. Close up of a completed micro-pile <br /> side of the bridge. installed to a depth of approximately 70 feet. <br /> of <br /> Figure 3. Load testing the installed micro-pile. Figure 4. Placement of sc4ffolding under a pier <br /> to support the weight of tl ie bridge as it is <br /> demolished. <br /> r <br /> Figure 5. Demolition of concrete encased Figure 6. Demolished pie#with a portion of the <br /> beams. structure being fully supported by scaffolding. <br /> Page 4 <br />