periods of water going over the dam. The patch performance has provided a good design to <br /> continue in the Phase II work. <br /> 2. Complete concrete repairs to the sluice gate access platform. Deteriorating concrete at the <br /> access platform needs to be replaced. <br /> 3. Install an Asian Carp barrier. As previously presented to City Council, this is a heavy duty <br /> screen that will be placed on top of the dam behind the bascule gates to keep Asian Carp from <br /> jumping into Lake Decatur during high flow conditions. <br /> 4. Remove the tail water dam. This is the old dam constructed circa 1906 that is approximately '/ <br /> mile downstream of the main dam. The tail water dam was significantly undercut by scour <br /> February 2012. A review performed by Hanson recommended that the dam be removed due to <br /> the costly repairs required and the limited benefit provided by the structure. Removal will also <br /> eliminate all future maintenance and operations expenses necessary for dam upkeep. This work <br /> will reduce or eliminate the tail water pool normally maintained below the main dam and <br /> restore this section of the Sangamon River to a more natural river ecosystem. <br /> 5. Complete scour repairs in the streambed downstream of the dam. The Phase I dam repair work <br /> included draining the tail pool which provided Hanson the opportunity to document scour <br /> damage downstream of the dam. The scour holes will be filled in and the existing pipelines <br /> crossing the river channel bed will be reinforced. <br /> Bidding <br /> The project plans and specifications were prepared by Hanson Professional Services. The project was <br /> advertised on April 24, 2013, and bids were opened on Wednesday, June 5, 2013. The results for the <br /> letting are as follows: <br /> ....................................... .. .........................................................................................................................,............................ .... <br /> Compared to <br /> Engineer's Est. <br /> .......................................... <br /> .............. ....... . <br /> Bidder Base Bid Price Qver(-Under) <br /> ....................�. <br /> Engineering&Construction Innovations,Inc. $4,159,573.00 49.70% <br /> ........_..._........._._........................................... ................................................................................................................_................ <br /> - ..............._......._...._._.._._...._......... . .....................,................................_.................................................................................. <br /> ; <br /> Mid-States General&Mechanical Contracting Corp. $5,578,735.00 100.78% <br /> _..._._._......._..............._.................__...................................................................................... <br /> Global Infrastructure <br /> $5,816,664.82 109.34/0 <br /> ..................._......_........__........I._......... <br /> .--._......._....,..........._.._............._._.._................................_.......................... <br /> .............. <br /> J F Brennan Company,Inc. $5,898,209.10 112.28% <br /> Engineer's Estimate $2,778,531.38 ------- <br /> Recommended Award <br /> Engineering & Construction Innovations, Inc. (ECI)of Oakdale, Minnesota provided the low bid for <br /> the proposed work. The bid was 49.7%over the Engineer's Estimate. The City's engineer, Hanson <br /> Professional Services, has investigated ECI's work record and has provided a recommendation that <br /> ECI is able to complete the work as specified. Staff recommends that the City Council approve a <br /> contract with ECI, to perform the Lake Decatur Dam Repairs Project - Phase II. <br /> SCHEDULE: <br /> Repair work is expected to commence later this summer and should be completed by summer 2015. <br /> Page 12 <br />