My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
R2013-74 ACCEPTING THE BID AND AUTHORIZING CONTRACT FOR LAKE DECATUR DAM REPAIRS
COD
>
City Clerk
>
RESOLUTIONS
>
2013
>
R2013-74 ACCEPTING THE BID AND AUTHORIZING CONTRACT FOR LAKE DECATUR DAM REPAIRS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/17/2015 11:07:18 AM
Creation date
8/17/2015 11:07:00 AM
Metadata
Fields
Template:
Resolution/Ordinance
Res Ord Num
R2013-74
Res Ord Title
ACCEPTING THE BID AND AUTHORIZING THE EXECUTION OF A CONTRACT FOR LAKE DECATUR DAM REPAIRS PROJECT - PHASE II
Department
Public Works
Approved Date
7/15/2013
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
266
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
GENERAL CONDITIONS ' <br /> GC-20 PHOTOGRAPHS OF EXISTING CONDITIONS <br /> See Technical Specification Section 013233. <br /> GC-21 PREVAILING WAGE RATES <br /> The Contractor shall supply the Engineer with weekly certified copies of the payroll for <br /> both the prime Contractor and their subcontractors. The Engineer will monitor the payroll for <br /> compliance with the applicable "prevailing wage rates" as required by the Special Conditions of , <br /> this contract. <br /> GC-22 PROJECT MAINTENANCE <br /> Should the City become aware of an unsafe condition existing within the scope of this <br /> project,the City will attempt to contact the Contractor to resolve the unsafe condition. However, <br /> if the City is unable to contact the Contractor's designated representative or if the Contractor fails <br /> to respond within a reasonable period, the City will perform the necessary operations and the <br /> cost for labor, equipment and materials will be deducted from the contract. <br /> GC-23 ROYALTIES, PATENTS AND COPYRIGHTS <br /> The Contractor shall pay all royalties and license fees. The Contractor shall defend suits <br /> or claims for infringement of copyrights and patent rights and shall hold the Owner and Engineer <br /> harmless from loss on account thereof, but shall not be responsible for such defense or loss when <br /> a particular design, process or product of a particular manufacturer or manufacturers is required <br /> by the Contract Documents or where the copyright violations are contained in Drawings, <br /> Specifications or other documents prepared by the Owner or Engineer. However, if the <br /> Contractor has reason to believe that the required design, process or product is an infringement <br /> of a copyright or a patent, the Contractor shall be responsible for such loss unless such , <br /> information is promptly furnished to the Engineer. <br /> GC-24 SAFETY <br /> The Contractor shall be responsible for the safety of all persons on the work, and shall <br /> exercise all necessary precautions and furnish necessary material to provide for the safety and <br /> protection of all persons on the work. The Contractor shall comply with the safety provisions of <br /> applicable building codes, Municipal, County, State and Federal, and provisions of the <br /> Occupational Safety and Health Act of 2000,and the standards established thereunder. <br /> The Contractor is solely responsible for any and all procedures, methods, structures or <br /> equipment submitted or employed. The acceptance thereof shall not in any manner relieve the <br /> Contractor of any liability whatsoever on account of any procedures or methods employed by <br /> them, or due to any failure or movement of any structures or equipment furnished by them. <br /> 27 ' <br />
The URL can be used to link to this page
Your browser does not support the video tag.