Laserfiche WebLink
GENERAL CONDITIONS ' <br /> GC-20 PHOTOGRAPHS OF EXISTING CONDITIONS <br /> See Technical Specification Section 013233. <br /> GC-21 PREVAILING WAGE RATES <br /> The Contractor shall supply the Engineer with weekly certified copies of the payroll for <br /> both the prime Contractor and their subcontractors. The Engineer will monitor the payroll for <br /> compliance with the applicable "prevailing wage rates" as required by the Special Conditions of , <br /> this contract. <br /> GC-22 PROJECT MAINTENANCE <br /> Should the City become aware of an unsafe condition existing within the scope of this <br /> project,the City will attempt to contact the Contractor to resolve the unsafe condition. However, <br /> if the City is unable to contact the Contractor's designated representative or if the Contractor fails <br /> to respond within a reasonable period, the City will perform the necessary operations and the <br /> cost for labor, equipment and materials will be deducted from the contract. <br /> GC-23 ROYALTIES, PATENTS AND COPYRIGHTS <br /> The Contractor shall pay all royalties and license fees. The Contractor shall defend suits <br /> or claims for infringement of copyrights and patent rights and shall hold the Owner and Engineer <br /> harmless from loss on account thereof, but shall not be responsible for such defense or loss when <br /> a particular design, process or product of a particular manufacturer or manufacturers is required <br /> by the Contract Documents or where the copyright violations are contained in Drawings, <br /> Specifications or other documents prepared by the Owner or Engineer. However, if the <br /> Contractor has reason to believe that the required design, process or product is an infringement <br /> of a copyright or a patent, the Contractor shall be responsible for such loss unless such , <br /> information is promptly furnished to the Engineer. <br /> GC-24 SAFETY <br /> The Contractor shall be responsible for the safety of all persons on the work, and shall <br /> exercise all necessary precautions and furnish necessary material to provide for the safety and <br /> protection of all persons on the work. The Contractor shall comply with the safety provisions of <br /> applicable building codes, Municipal, County, State and Federal, and provisions of the <br /> Occupational Safety and Health Act of 2000,and the standards established thereunder. <br /> The Contractor is solely responsible for any and all procedures, methods, structures or <br /> equipment submitted or employed. The acceptance thereof shall not in any manner relieve the <br /> Contractor of any liability whatsoever on account of any procedures or methods employed by <br /> them, or due to any failure or movement of any structures or equipment furnished by them. <br /> 27 ' <br />