Laserfiche WebLink
GENERAL CONDITIONS <br /> The Contractor shall be held responsible for protecting all utilities and in the event the <br /> contractor damages any of them, they shall be replaced by the Contractor to the satisfaction of <br /> the utility owner at their own expense. <br /> GC-16 MEASUREMENT AND PAYMENT <br /> Payment shall be made only for those items listed in the Schedule of Prices in the <br /> Contractor's proposal, except as extra work may be directed by the Engineer, in writing, during <br /> construction. Miscellaneous items of work not specifically listed in the Contractor's proposal <br /> shall be considered incidental to the contract work and the cost thereof shall be included in the <br /> appropriate contract bid item. <br /> GC-17 METHOD OF PAYMENT <br /> Requests for partial payment may be submitted, in writing, at least once each month by <br /> the Contractor to the Engineer. Requests shall make an approximate estimate of the materials in <br /> place complete, the amount of work performed, and the value thereof, at the contract unit prices. <br /> Copies of the certified payroll for employees of the Contractor and for the respective <br /> subcontractors should be submitted with the request. Copies of the invoices for materials and <br /> equipment actually on the job site for which payment is requested by the Contractor shall be <br /> included in the request. <br /> Payments by the City will be equal to the approved partial payment amount, less <br /> retainage in accordance with Section 109.07 of the Illinois Department of Transportation <br /> Standard Specifications for Road and Bridge Construction, adopted January 1, 2012. Retainage <br /> will be released to the Contractor upon satisfactory completion of the work and shall be used for <br /> necessary adjustments to the pay schedule which may result from irregularities, substitutions or <br /> changes. <br /> GC-18 NO PARKING SIGNS <br /> Not Applicable <br /> GC-19 PERMITS <br /> It is the Contractor's responsibility to obtain all necessary permits. Any costs incurred in <br /> obtaining these permits are to be incidental to the related contract item. Permit fees will be <br /> waived for those permits issued by the City of Decatur. <br /> Work shall be done in accordance with the Section 404 Nationwide Permit 3, <br /> Maintenance. The contractor must comply with the conditions of this nationwide permit as well <br /> as the Section 401 Water Quality Certification conditions stipulated by the Illinois <br /> Environmental Protection Agency for Nationwide Permit 3. <br /> Work shall be done in accordance with Illinois Department of Natural Resources <br /> Statewide Permit No. 9 "Minor Shoreline, Stream Bank, and Channel Protection Activities." <br /> The Contractor must comply with these conditions. <br /> 26 <br />