Laserfiche WebLink
Exhibit A <br /> SCOPE OF WORK <br /> Services to be provided for the Project are as follows: <br /> TELEVISED PIPELINE INSPECTION/SURVEY <br /> I. A color television camera capable of insertion into 100% humidity conditions will be <br /> used on this project. The camera head is capable of panning 270° and tilting 360° and the <br /> iris,focus and light source are all remote controlled in order to look directly at problem <br /> areas, as well as up service connections. The camera will be transported through the lines <br /> on a remote controlled transporter at approximately 30 feet per minute, stopping at <br /> problem areas to insure proper logging of data. <br /> 2. The Data Collected, stored and downloaded to the city mainframe will be in a MPEG <br /> digital format applicable to the current City of Decatur Engineering Software,that will be <br /> used to observe and record features and conditions that will assist in the evaluation of the <br /> data collected and become a part of the final report. All inspection crews are PACP <br /> Certified. TSI shall use Granite XP with the ESRI module and the scoring module by <br /> Cues Inc. <br /> 3. Trak control and protection for the project shall be in accordance with I.D.O.T. <br /> Highway Standard 701606.01. Daytime operations are proposed for the work. <br /> STORM/SANITARY SEWER CLEANING <br /> 1. A high velocity sewer cleaning and vacuum combination truck will be used. Cleaning <br /> shall be accomplished by using a pump capable of delivering 60 GPM at 2500 PSI. All <br /> debris from the cleaning process will be removed with the Vac System. City of Decatur <br /> will supply water and dump site for any solids gathered. <br /> MANHOLE INVESTIGATION <br /> 1. A physical/visual investigation of each manhole using all necessary safety <br /> equipment. The investigation will include obtaining all data required to evaluate <br /> each manhole for structural integrity, inflow/infiltration problems, flow <br /> characteristics and environmental conditions. Including all necessary <br /> dimensions. <br /> SMOKE TESTING <br /> 1. Insertion of an inert type smoke bomb of three-minute duration into manholes by means <br /> of a 3000-cfm or larger blower. Logging of data including color photos of locations or <br /> smoke observed. <br /> Last Revised:05-15-2013 A-1 <br />