My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
R2013-58 ACCEPTING THE BID AND AUTHORIZING A CONTRACT
COD
>
City Clerk
>
RESOLUTIONS
>
2013
>
R2013-58 ACCEPTING THE BID AND AUTHORIZING A CONTRACT
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/17/2015 4:29:07 PM
Creation date
8/17/2015 4:28:53 PM
Metadata
Fields
Template:
Resolution/Ordinance
Res Ord Num
R2013-58
Res Ord Title
ACCEPTING THE BID AND AUTHORIZING THE EXECUTION OF A CONTRACT FOR CONCRETE PAVEMENT RECONSTRUCTION L & A INDUSTRIAL DRIVE PHASE 2
Department
Public Works
Approved Date
6/17/2013
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
209
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
' CITY OF DECATUR <br /> SPECIAL PROVISIONS <br /> SP-1 DESCRIPTION OF WORK <br /> ' The proposed improvement, designated as Section 12-00211-00-RP, consists of removing <br /> 3,615 square yards of PCC pavement and replacing it with either a Class B patch, 8"jointed PCC <br /> pavement with 4" CA-6 base and 8" lime stabilized sub-base, or High-Early-Strength PCC <br /> pavement with 8" CA-6 base as called out on the plans. The work includes temporary traffic <br /> signals and other items of traffic control. <br /> ' SP-2 TRAFFIC CONTROL <br /> ' Description: Traffic control shall be in accordance with the applicable sections of the <br /> Standard Specifications for Road and Bridge Construction,the applicable guidelines contained in <br /> the Illinois Manual on Uniform Traffic Devices for Streets and Highways, these Standard <br /> Specifications, and any special details and Highway Standards contained herein and in the plans. <br /> Special attention is called to Articles 107.09 and 107.14 and Sections 701, 702, and 703 <br /> of the Standard Specifications for Road and Bridge Construction and the following highway <br /> ' standards relating to traffic control: <br /> Highway Standards: 701501, 701602 701901 <br /> ' It is the intent of the City that all streets affected by this project be kept open to traffic at <br /> all times unless permission is obtained from the Engineer to close said lane and/or street. <br /> When closing a lane or street, the Engineer shall be consulted to obtain permission at <br /> least 48 hours in advance of the proposed closure. All appropriate lane closure permits shall <br /> be filed with the Public Works Department prior to any closures. In addition, at the end of <br /> ' every work day the lane and/or street shall be opened to local traffic unless approved by the <br /> Engineer. It shall be the responsibility of the Engineering Division of the Public Works <br /> Department to notify all forms of local media of the schedule of street closures for the following <br /> ' week, after approval by the Engineer. A copy of the media release will be provided to the <br /> Contractor. <br /> ' When closing the westbound lane on L&A Industrial Drive. The contractor shall provide <br /> and install all signs as provided in the plans and additional signs as required to provide the <br /> necessary traffic signal and lane assignment information to the public. During construction, all <br /> traffic accessing L&A Industrial Drive will only be allowed right in right out access. The <br /> ' contractor shall install barricades as noted on the plans, and add additional signs as required to <br /> prohibit left turns into or out of L&A Industrial Drive. <br /> ' Traffic control standards shall be applied as directed by the Engineer. Applications for <br /> each standard are as follows: <br /> ' Traffic Standard 701501: This standard shall be utilized when closing the westbound <br /> lane on L&A Industrial Drive; included will be the additional traffic control shown on the <br /> plans and as required to operate the temporary traffic signal system. <br /> ' Traffic Standard 701602: This standard shall be utilized when closing the southbound <br /> outside lane on Brush College Road to provide right turn stacking protection for vehicles <br /> turning onto L&A Industrial Drive from the north. <br />
The URL can be used to link to this page
Your browser does not support the video tag.