My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
R2013-58 ACCEPTING THE BID AND AUTHORIZING A CONTRACT
COD
>
City Clerk
>
RESOLUTIONS
>
2013
>
R2013-58 ACCEPTING THE BID AND AUTHORIZING A CONTRACT
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/17/2015 4:29:07 PM
Creation date
8/17/2015 4:28:53 PM
Metadata
Fields
Template:
Resolution/Ordinance
Res Ord Num
R2013-58
Res Ord Title
ACCEPTING THE BID AND AUTHORIZING THE EXECUTION OF A CONTRACT FOR CONCRETE PAVEMENT RECONSTRUCTION L & A INDUSTRIAL DRIVE PHASE 2
Department
Public Works
Approved Date
6/17/2013
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
209
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CITY OF DECATUR , <br /> SPECIAL PROVISIONS <br /> SP-2 TRAFFIC CONTROL (CONTINUED) <br /> All additional traffic control as required in the standard details and plans that are not <br /> specifically provided for herein will be considered as included with the various pay items ' <br /> requiring traffic control. <br /> Basis of Payment: Traffic control and protection will be paid for at the contract unit ' <br /> price as a LUMP SUM for TRAFFIC CONTROL (SPECIAL). <br /> SP-3 SAWING PAVEMENT (FULL DEPTH) , <br /> Description: This work will consist of providing a uniformly straight full depth saw cut ' <br /> with a diamond tipped concrete saw in varying depths of pavement, medians, curb and gutter and <br /> at other locations where proposed improvements will abut existing improvements, as indicated in <br /> the plans or as directed by the Engineer. ' <br /> Method of Measurement: Only the saw cuts necessary for the Class B Patching line <br /> item will be measured for payment. , <br /> Basis of Payment: All labor, equipment and materials necessary to provide Class B <br /> Patching will be included in the contract unit price per FOOT for SAW CUTS and no additional , <br /> compensation will be paid. All other saw cuts will not be paid but will be considered included <br /> with PAVEMENT REMOVAL per SQUARE YARD and no additional compensation will be ' <br /> paid. <br /> SP-4 TIE BARS AND DOWEL BARS , <br /> Description: This work will consist of providing tie bars and dowel bars within the <br /> pavement and patches across all joints. Bar spacing and lengths are detailed in Standard 420001 <br /> for pavement and Standard 442101 for Class B Patches. , <br /> Method of Measurement: Only tie bars and dowel bars necessary for the Class B <br /> Patching line item will be measured for payment. ' <br /> Basis of Payment: All labor, equipment and materials necessary to provide Class B <br /> Patching will be included in the contract unit price for TIE BARS 1 1/4"and DOWEL BARS 1 , <br /> 1/2"EACH and no additional compensation will be paid. All other bars will not be paid but will <br /> be considered included with PORTLAND CEMENT CONCRETE PAVEMENT, 8" (JOINTED) <br /> and HIGH-EARLY-STRENGTH PORTLAND CEMENT CONCRETE PAVEMENT, 8"per ' <br /> SQUARE YARD and no additional compensation will be paid. <br />
The URL can be used to link to this page
Your browser does not support the video tag.