My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
R2013-58 ACCEPTING THE BID AND AUTHORIZING A CONTRACT
COD
>
City Clerk
>
RESOLUTIONS
>
2013
>
R2013-58 ACCEPTING THE BID AND AUTHORIZING A CONTRACT
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/17/2015 4:29:07 PM
Creation date
8/17/2015 4:28:53 PM
Metadata
Fields
Template:
Resolution/Ordinance
Res Ord Num
R2013-58
Res Ord Title
ACCEPTING THE BID AND AUTHORIZING THE EXECUTION OF A CONTRACT FOR CONCRETE PAVEMENT RECONSTRUCTION L & A INDUSTRIAL DRIVE PHASE 2
Department
Public Works
Approved Date
6/17/2013
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
209
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CITY OF DECATUR <br /> SPECIAL PROVISIONS <br /> ' SP-5 AGGREGATE BASE COURSE FOR CLASS B PATCHES <br /> Description: This work will consist of installing an aggregate base course under Class B <br /> Patches in accordance with Section 351 of the Standard Specifications. The work will include <br /> over excavating to a depth of 4" below the bottom of the pavement slab and installing compacted <br /> CA-6 aggregate. <br /> Method of Measurement: The excavation of material below the base of the pavement <br /> ' slab will not be measured for payment. The placement of aggregate base course, Class B Patches <br /> and associated items will be measured in accordance with the specifications. <br /> ' Basis of Payment: All labor, equipment, and materials necessary to excavate and <br /> provide and install CA-6 aggregate under the patches will be paid for at the contract unit price <br /> per square yard for AGGREGATE BASE COURSE, TYPE B, 4". The over excavation of <br /> ' material at the various patches will not be paid for separately but will be considered included in <br /> CLASS B PATCHES <br /> ' SP-6 DRIVEWAYS <br /> Description: Work done adjacent to the north and south driveways on the far west end <br /> ' of the project (Sta. 10+62 toll+10 and Sta. 10+62 to 11+89)will be completed on the weekend <br /> so that those two driveways can be closed in order to complete the work with minimal disruption <br /> to businesses. Work can begin as early as 4:30pm Friday afternoon and High-Early-Strength PCC <br /> Pavement with 8 inches of CA-6 aggregate with no lime modification will be used to provide a <br /> drivable surface by 5:00am Monday morning. If the contractor chooses to pour both lanes at the <br /> ' same time,the contractor shall follow Highway Standard 420001 for a longitudinal sawed joint. <br /> Otherwise follow the detail for the longitudinal construction joint in the same standard. <br /> ' For the driveway located at Sta. 12+90 at least half of the eastbound and westbound lanes <br /> adjacent to this driveway must remain open for the duration of the project to allow turning in and <br /> out of that driveway,unless other arrangements are made with the property owner. <br /> All other driveways must remain open and accessible except for periods not to exceed 6 <br /> hours as coordinated with the property owner. Concrete poured adjacent to drive approaches <br /> shall meet the requirements of Article 701.17 (e) (3) of the Standard Specifications to allow for <br /> opening to traffic within 6 hours. The contractor will be responsible for coordinating this work <br /> with the property owner. <br />
The URL can be used to link to this page
Your browser does not support the video tag.