My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
R2013-37 EXEMPTING LAKE SHORE DRIVE SEWER REHABILITATION PROJECT FROM THE HOURS OF CONSTRUCTION LIMITATIONS
COD
>
City Clerk
>
RESOLUTIONS
>
2013
>
R2013-37 EXEMPTING LAKE SHORE DRIVE SEWER REHABILITATION PROJECT FROM THE HOURS OF CONSTRUCTION LIMITATIONS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/18/2015 3:11:29 PM
Creation date
8/18/2015 3:11:26 PM
Metadata
Fields
Template:
Resolution/Ordinance
Res Ord Num
R2013-37
Res Ord Title
EXEMPTING THE LAKE SHORE DRIVE SEWER REHABILITATION PROJECT FROM THE HOURS OF CONSTRUCTION LIMITATIONS REQUIRED BY CHAPTER 48 SECTION 12 OF THE CITY CODE
Approved Date
4/15/2013
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
32
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
a. Consult with Engineer in advance of scheduled major inspections, tests, <br /> and systems startups of important phases of the Work. <br /> b. Verify that tests, equipment, and systems start-ups and operating and <br /> maintenance training are conducted in the presence of appropriate <br /> Owner's personnel, and that Contractor maintains adequate records <br /> thereof. <br /> c. Observe, record, and report to Engineer appropriate details relative to <br /> the test procedures and systems start-ups. <br /> d. Accompany visiting inspectors representing public or other agencies <br /> having jurisdiction over the Project, record the results of these <br /> inspections, and report to Engineer. <br /> 10.Records: <br /> a. Maintain at the Site orderly files for correspondence, reports of job <br /> conferences, reproductions of original Contract Documents including all <br /> Change Orders, Field Orders, Work Change Directives, Addenda, <br /> additional Drawings issued subsequent to the execution of the Contract, <br /> Engineer's clarifications and interpretations of the Contract Documents, <br /> progress reports, Shop Drawing and Sample submittals received from <br /> and delivered to Contractor, and other Project-related documents. <br /> b. Prepare a daily report or keep a diary or log book, recording <br /> Contractor's hours on the Site, weather conditions, data relative to <br /> questions of Change Orders, Field Orders, Work Change Directives, or <br /> changed conditions, Site visitors, daily activities, decisions, observations <br /> in general, and specific observations in more detail as in the case of <br /> observing test procedures; and send copies to Engineer. <br /> c. Record names, addresses, fax numbers, e-mail addresses, web site <br /> locations, and telephone numbers of all Contractors, subcontractors, <br /> and major suppliers of materials and equipment. <br /> d. Maintain records for use in preparing Project documentation. <br /> e. Upon completion of the Work, furnish original set of all RPR Project <br /> documentation to Engineer. <br /> 11.Reports: <br /> a. Furnish to Engineer periodic reports as required of progress of the Work <br /> and of Contractor's compliance with the progress schedule and <br /> schedule of Shop Drawing and Sample submittals. <br /> b. Draft and recommend to Engineer proposed Change Orders, Work <br /> Change Directives, and Field Orders. Obtain backup material from <br /> Contractor. <br /> Last Revised: 10/17/2012 <br />
The URL can be used to link to this page
Your browser does not support the video tag.