My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
R2013-37 EXEMPTING LAKE SHORE DRIVE SEWER REHABILITATION PROJECT FROM THE HOURS OF CONSTRUCTION LIMITATIONS
COD
>
City Clerk
>
RESOLUTIONS
>
2013
>
R2013-37 EXEMPTING LAKE SHORE DRIVE SEWER REHABILITATION PROJECT FROM THE HOURS OF CONSTRUCTION LIMITATIONS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/18/2015 3:11:29 PM
Creation date
8/18/2015 3:11:26 PM
Metadata
Fields
Template:
Resolution/Ordinance
Res Ord Num
R2013-37
Res Ord Title
EXEMPTING THE LAKE SHORE DRIVE SEWER REHABILITATION PROJECT FROM THE HOURS OF CONSTRUCTION LIMITATIONS REQUIRED BY CHAPTER 48 SECTION 12 OF THE CITY CODE
Approved Date
4/15/2013
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
32
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
c. Furnish to Engineer and Owner copies of all inspection, test, and system <br /> start-up reports. <br /> d. Immediately notify Engineer of the occurrence of any Site accidents, <br /> emergencies, acts of God endangering the Work, damage to property <br /> by fire or other causes, or the discovery of any Constituent of Concern. <br /> 12.Payment Requests: Review Applications for Payment with Contractor for <br /> compliance with the established procedure for their submission and forward <br /> with recommendations to Engineer, noting particularly the relationship of the <br /> payment requested to the schedule of values, Work completed, and <br /> materials and equipment delivered at the Site but not incorporated in the <br /> Work. <br /> 13.Certificates, Operation and Maintenance Manuals: During the course of the <br /> Work, verify that materials and equipment certificates, operation and <br /> maintenance manuals and other data required by the Specifications to be <br /> assembled and furnished by Contractor are applicable to the items actually <br /> installed and in accordance with the Contract Documents, and have these <br /> documents delivered to Engineer for review and forwarding to Owner prior <br /> to payment for that part of the Work. <br /> 14.Completion: <br /> a. Participate in a Substantial Completion inspection, assist in the <br /> determination of Substantial Completion and the preparation of lists of <br /> items to be completed or corrected. <br /> b. Participate in a final inspection in the company of Engineer, Owner, and <br /> Contractor and prepare a final list of items to be completed and <br /> deficiencies to be remedied. <br /> c. Observe whether all items on the final list have been completed or <br /> corrected and make recommendations to Engineer concerning <br /> acceptance and issuance of the Notice of Acceptability of the Work. <br /> P P tY <br /> D. Resident Project Representative shall not: <br /> 1. Authorize any deviation from the Contract Documents or substitution of <br /> materials or equipment (including "or-equal" items). <br /> 2. Exceed limitations of Engineer's authority as set forth in the Agreement or <br /> the Contract Documents. <br /> 3. Undertake any of the responsibilities of Contractor, subcontractors, <br /> suppliers, or Contractor's superintendent. <br /> 4. Advise on, issue directions relative to, or assume control over any aspect of <br /> the means, methods, techniques, sequences or procedures of Contractor's <br /> Last Revised: 10/17/2012 <br />
The URL can be used to link to this page
Your browser does not support the video tag.