Laserfiche WebLink
DECATUR POLICE FACILITY Exhibit A <br /> DETAILED SCHEDULE <br /> Study <br /> 08/30/12 * Review Options (4) LEC <br /> • Walk through 625 Southside Drive (SEC) <br /> 09/18/12 • Review options (3-4) SSD <br /> • Confirm program <br /> • Review Budget/ Schedule <br /> 10/01/12 o Final option selection <br /> • Budget, Schedule, Recommendation <br /> 01/22/13 • Presentation to council <br /> • Authorization to proceed with criteria package <br /> Implementation / Criteria Package/ Construction (SSD) <br /> 02/15/13 • Schematic design workshop with users /Design Build team (includes Arch, MEP. <br /> and Civil basic work plan) <br /> • Document and develop <br /> 03/15/13 • SD Complete <br /> 04/01/13 • DD workshop with users/Design Build team (includes Arch, MEP, and Civil) <br /> 05/22/13 • DD Complete <br /> 05/30/13 • Issue criteria package to design build team <br /> 07/30/13 • Review final design build documents <br /> 08/15/13 • Construction start <br /> 02/28/14 o Construction complete <br /> Dewberry <br />