Laserfiche WebLink
f. Revise 25000600 POTASSIUM FERT.NUTR. POUND 19 TO 7 <br /> g. Revise 25100105 MULCH METHOD 1 ACRE 0.21 TO 0.07 <br /> h. Revise 30200650 PROCESSING MOD. SOIL 12" SQYD 2,641 TO 1,147 <br /> i. Revise 30201500 LIME TON 60 TO 26 <br /> j. Revise 31100300 SUBBASE GRAN.MAT. TY A 4" SQYD 2,580 TO 1,147 <br /> k. Revise 35300300 PCC BASE COURSE 8" SQYD 2,209 TO 1,147 <br /> 1. Revise 40600200 BIT.MATERIALS PRIME COAT TON 13.4 TO 13.6 <br /> m. Revise 40600300 AGGREGATE(PRIME COAT) TON 70.7 TO 71.4 <br /> n. Delete 40603545 POLY. HMA SURF. CSE,MIX"D",N90 TON 3,784 <br /> o. Add 40603345 HMA SURFACE COURSE,MIX"D",N90 TON 2,868 <br /> ' p. Revise 40800050 INCIDENTAL HMA SURFACING TON 169 TO 129 <br /> q. Revise 42300400 PCC DRIVEWAY PAV, 8 INCH SQYD 208 TO 88 <br /> r. Revise 44000100 PAVEMENT REMOVAL SQYD 2,524 TO 1,147 <br /> ' s. Delete 44000157 HMA SURFACE REMOVAL,2" SQYD 33,075 <br /> t. Add 44000155 HMA SURFACE REMOVAL, 1 '/z" SQYD 34,478 <br /> u. Revise 44000200 DRIVEWAY PAVT REMOVAL SQYD 387 TO 274 <br /> v. Revise 44000500 COMB CONC CURB AND GUT REM FOOT 2,075 TO 981 <br /> w. Revise 44000600 SIDEWALK REMOVAL SQFT 6,785 TO 5,640 <br /> x. Revise 44201025 CLASS B PATCH,TY IV, 14 INCH SQYD 766 TO 821 <br /> ' y. Revise 44201299 DOWEL BARS 1 '/2" EACH 1,346 TO 1,518 <br /> z. Revise 44213100 PAVEMENT FABRIC SQYD 766 TO 821 <br /> aa. Revise 44213200 SAW CUTS FOOT 1,777 TO 1,965 <br /> bb. Revise 60107600 PIPE UNDERDRAINS 4" FOOT 831 TO 873 <br /> cc. Revise 60605000 COMB CC&G,TYPE B-6.24 FOOT 1,189 TO 95 <br /> dd. Revise 70103815 TR CONT SURVEILLANCE CAL DAY 137 TO 122 <br /> ee. Revise 70400100 TEMP CONC BARRIER FOOT 550 TO 275 <br /> ff. Revise 70400200 REL TEMP CONC BARRIER FOOT 550 TO 275 <br /> gg. Revise 78000400 THERMO PVT MKG—LINE 6" FOOT 4,251 TO 4,209 <br /> hh. Revise 78000600 THERMO PVT MKG—LINE 12" FOOT 2,183 TO 2,428 <br /> ' ii. Revise 78200530 BAR WALL MKR,TYPE C EACH 7 TO 4 <br /> J. Delete Z0013798 CONSTRUCTION LAYOUT L SUM 1 <br /> 3. Sheets 9 through 13 of 63: The following revisions to the Typical Sections: <br /> a. Change Hot-Mix Asphalt Surface Removal,2"to 1 '/z" <br /> b. Change 2"Polymerized Hot-Mix Asphalt Surface Course,Mix"D",N90 to 1 '/2"Hot-Mix <br /> Asphalt Surface Course,Mix"D",N90. <br /> 4. Sheet 14, 15 and 16 of 63: The following revisions to the Schedule of Quantities <br /> ' a. Revised HMA Surface Removal thickness <br /> b. Revised Pavement Removal <br /> c. Revised Driveway Pavement Removal <br /> d. Revised Combination Concrete Curb and Gutter Removal <br /> e. Revised Sidewalk Removal <br /> f. Deleted Earthwork Schedule <br /> ' 5. Sheet 17 of 63: The following revisions to the Schedule of Quantities <br /> a. Added Patching for Main Street <br /> b. Revised Temporary Concrete Barrier <br /> c. Revised Relocated Temporary Concrete Barrier <br /> d. Revised Barrier Wall Markers Type C <br /> ' 2 <br />