My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
R2012-161 ACCEPTING THE BID AND AUTHORIZING CONTRACT FOR FRANKLIN & MAIN STREETS RECONSTRUCTION & REHABILITATION
COD
>
City Clerk
>
RESOLUTIONS
>
2012
>
R2012-161 ACCEPTING THE BID AND AUTHORIZING CONTRACT FOR FRANKLIN & MAIN STREETS RECONSTRUCTION & REHABILITATION
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/20/2015 11:07:09 AM
Creation date
8/20/2015 11:06:32 AM
Metadata
Fields
Template:
Resolution/Ordinance
Res Ord Num
R2012-161
Res Ord Title
ACCEPTING THE BID AND AUTHORIZING THE EXECUTION OF A CONTRACT FOR FRANKLIN & MAIN STREETS RECONSTRUCTION & REHABILITATION
Department
Public Works
Approved Date
8/20/2012
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
170
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
' 6. Sheets 17 and 18 of 63:The following revisions to the Paving Schedule of Quantities <br /> a. Revised Processing Modified Soil 12" <br /> b. Revised Lime <br /> ' c. Revised Subbase Granular Material Type A 4" <br /> d. Revised Portland Cement Concrete Base Course 8" <br /> e. Revised Aggregate(Prime Coat) <br /> f. Revised Bituminous Materials(Prime Coat) <br /> ' g. Revised Temporary Ramp <br /> h. Revised Polymerized HMA Surface to HMA Surface <br /> i. Revised Incidental HMA Surfacing <br /> j. Revised Portland Cement Concrete Driveway Pavement <br /> k. Revised Combination Concrete Curb and Gutter Type B-6.24 <br /> ' 7. Sheet 19 of 63:The following revisions to the Seeding Schedule of Quantities <br /> a. Deleted areas to get seeding,fertilizers and mulch <br /> 8. Sheet 21 of 63: The following revisions to the Pavement Marking Schedule of Quantities <br /> a. Revised quantities for Thermoplastic Line 6" <br /> b. Revised quantities for Thermoplastic Line 12" <br /> ' 9. Sheet 22 of 63: The following revisions to the Drainage Schedule of Quantities <br /> a. Revised Pipe Underdrains 4" <br /> ' 10. Sheet 26 of 63: Revised the limits of Pavement Resurfacing and Pavement Removal <br /> 11. Sheets 30 through 36 of 63: Revised the Surface Removal from 2"to 1 '/2" <br /> ' 12. Sheets 37 and 38 of 63: Revised the Resurfacing and Reconstruction Limits,Added Class B Patches, <br /> Deleted Proposed Curb and Gutter <br /> ' 13. Sheet 45 of 63: Revised lane dimensions <br /> 14. Sheet 51 of 63: Revised striping(reduced dotted line and increase solid line for taper) <br /> 15. Sheet 52 of 63: Revised 2"to 1 '/2" <br /> ' 16. Sheet 53 of 63: Revised 2"to 1 ''/2"and Delete two(2)Driveway locations <br /> 17. Sheets 57 to 63: Revised Cross Sections according to the Pavement Removal revisions and Deleted <br /> ' Sheets 60,61,62 and 63 <br /> 3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.