Laserfiche WebLink
' 6. Sheets 17 and 18 of 63:The following revisions to the Paving Schedule of Quantities <br /> a. Revised Processing Modified Soil 12" <br /> b. Revised Lime <br /> ' c. Revised Subbase Granular Material Type A 4" <br /> d. Revised Portland Cement Concrete Base Course 8" <br /> e. Revised Aggregate(Prime Coat) <br /> f. Revised Bituminous Materials(Prime Coat) <br /> ' g. Revised Temporary Ramp <br /> h. Revised Polymerized HMA Surface to HMA Surface <br /> i. Revised Incidental HMA Surfacing <br /> j. Revised Portland Cement Concrete Driveway Pavement <br /> k. Revised Combination Concrete Curb and Gutter Type B-6.24 <br /> ' 7. Sheet 19 of 63:The following revisions to the Seeding Schedule of Quantities <br /> a. Deleted areas to get seeding,fertilizers and mulch <br /> 8. Sheet 21 of 63: The following revisions to the Pavement Marking Schedule of Quantities <br /> a. Revised quantities for Thermoplastic Line 6" <br /> b. Revised quantities for Thermoplastic Line 12" <br /> ' 9. Sheet 22 of 63: The following revisions to the Drainage Schedule of Quantities <br /> a. Revised Pipe Underdrains 4" <br /> ' 10. Sheet 26 of 63: Revised the limits of Pavement Resurfacing and Pavement Removal <br /> 11. Sheets 30 through 36 of 63: Revised the Surface Removal from 2"to 1 '/2" <br /> ' 12. Sheets 37 and 38 of 63: Revised the Resurfacing and Reconstruction Limits,Added Class B Patches, <br /> Deleted Proposed Curb and Gutter <br /> ' 13. Sheet 45 of 63: Revised lane dimensions <br /> 14. Sheet 51 of 63: Revised striping(reduced dotted line and increase solid line for taper) <br /> 15. Sheet 52 of 63: Revised 2"to 1 '/2" <br /> ' 16. Sheet 53 of 63: Revised 2"to 1 ''/2"and Delete two(2)Driveway locations <br /> 17. Sheets 57 to 63: Revised Cross Sections according to the Pavement Removal revisions and Deleted <br /> ' Sheets 60,61,62 and 63 <br /> 3 <br />