r <br /> calibration process, portable scales used to calibrate the mixing machine for <br /> emulsion and aggregate shall be checked with 25 Ib and 50 Ib weights, respectively. <br /> Results from the standard weight checks shall be furnished to the Engineer. No <br /> machine will be allowed to work on the project until the calibration has been <br /> completed and/or accepted. <br /> (2) Micro-Surfacing Spreader. The mixture shall be agitated and spread uniformly in the <br /> surfacing box by means of twin shafted paddles or spiral augers fixed in the spreader <br /> box. A front seal shall be provided to insure no loss of the mixture at the road <br /> contact point. The rear seal shall act as a final strike-off and shall be adjustable_ <br /> The spreader box and rear strike-off shall be so designed and operated that a <br /> uniform consistency is achieved to produce a free flow of material to the rear strike- <br /> off. The spreader box shall have suitable means provided to side shift the box to <br /> compensate for variations in the pavement geometry. <br /> A secondary strike-off shall be provided to improve surface texture on the surface <br /> course. The secondary strike-off shall have the same adjustments as the spreader <br /> box and shall not bounce, wobble, or chatter. <br /> When required on the plans, before the final surface course is placed, preliminary <br /> micro-surfacing material may be required to fill ruts, utility cuts, depressions in the <br /> existing surface, etc. Ruts of 1/2 in. (13 mm) or greater in depth shall be filled <br /> independently with a rut-filling spreader box, either 5 or 6 ft (1.5 or 1.8 m) in width. <br /> For irregular or shallow rutting of less than 1/2 in. (13 mm) in depth, a full-width <br /> scratch-coat pass may be used as directed by the Engineer utilizing either a stiff <br /> primary rubber or else a metal primary strike off. Ruts that are in excess of 1 1/2 in. <br /> (38 mm) in depth may require multiple placements with the rut-filling spreader box to <br /> restore the cross-section. All rut-filling level-up material should cure under traffic for <br /> a minimum of 24 hours before additional material is placed on top of the level up. <br /> (3) Micro-Surfacing Proportioning Devices. Individual volume or weight controls for <br /> proportioning each material to be added to the mix (i.e. aggregate, mineral filler, <br /> emulsified asphalt, additive, and water) shall be provided and properly marked. <br /> These proportioning devices are used in material calibration and determining the <br /> material output at any time. Calibration records, conversion formulas, and daily run <br /> sheets including the beginning and final numbers shown on the proportioning <br /> devices shall be submitted to the Engineer for approval. During production any <br /> deviations from the original JMF shall be approved by the Engineer. <br /> (b) Crack/Joint Sealing. Equipment shall be according to the following. <br /> r (1) Air Compressor. The air compressor shall be capable of producing a minimum <br /> pressure of 90 psi (620 kPa) at the end of the discharge hose. The air stream shall <br /> discharge onto the pavement through an appropriate air lance. The tool lubricator <br /> shall be bypassed and a filter installed on the discharge valve to keep water and oil <br /> out of the line. <br /> r <br /> r <br />