Compatibility of the aggregate, latex-modified emulsified asphalt, mineral filler, and other <br /> additives shall be verified by the mix design. The materials shall meet the following <br /> requirements for ISSA A143. <br /> ISSA Test No. Description Specification <br /> ISSA TB-139 Wet Cohesion <br /> @ 30 minutes min. (Set) 12 kg-cm min. <br /> 60 minutes min. Traffic 20 kg-cm min. or Near Spin <br /> ISSA TB-109 Excess Asphalt by LWT Sand 50 gm/sq ft (538 gm/sq m) max. <br /> Adhesion <br /> ISSA TB-114 Wet Stripping Pass 90% min. <br /> ISSA TB-100 Wet-Track Abrasion Loss <br /> One-hour Soak 50 gm/sq ft (538 gm/sq m) max. <br /> Six-day Soak 75 m/s ft 807 m/s m max. <br /> ISSA TB-147 Lateral Displacement 5% max. <br /> Specific Gravity after 1,000 Cycles 2.10 max. <br /> of 25 Ib 11.34 k <br /> ' ISSA TB-144 Classification Compatibility 11 Grade Points min. <br /> AAA, BAA <br /> ISSA TB-113 Mix Time @ 77 OF (25 °C) Controllable to 120 seconds <br /> Min. <br /> The mixing test and set-time test shall be checked at the highest temperatures expected during <br /> construction. <br /> The mix design shall report the quantitative effects of moisture content on the unit weight of the <br /> ' aggregate (bulking effect). The report shall clearly show the proportions of aggregate, mineral <br /> filler (minimum and maximum), water (minimum and maximum), additive usage, and latex- <br /> modified asphalt emulsion based on the dry weight of the aggregate. <br /> For the aggregate blend in the mix design, test results for AASHTO T 176 shall be provided with <br /> the mix information to the Engineer. Aggregate test values below 65 shall require review and <br /> approval from the Engineer. <br /> Before the work commences, the Contractor shall submit to the Engineer a complete mix design <br /> covering the specific materials to be used on the project. The percentages of each individual <br /> material required shall be shown in the laboratory report. The Engineer shall approve the mix <br /> design prior to its use. After approval, no substitutions will be permitted, unless approved by the <br /> Engineer, and the Contractor shall maintain continuous control of the latex-modified emulsified <br /> ' asphalt to dry aggregate proportioning to conform to the approved mix design within a tolerance <br /> of± 2 gal/ton (± 8 Umetric ton). <br /> ' Test Strip. For projects over 100,000 sq yd (83,600 sq m), at least one day prior to starting the <br /> project the Contractor shall designate a mutually agreeable location and apply a test strip of <br /> micro-surfacing using the aggregate indicated in the mix design. The Engineer will evaluate the <br /> ' micro-surfacing application rate and cure time. <br />