Laserfiche WebLink
1Determinations of application rates shall be fromdaily readings taken from the material <br /> control devices during the progress of the work. <br /> The pavement surface shall be prewetted by water fogging ahead of the spreader box <br /> when road conditions require, as determined by the Engineer. The rate of fogging shall <br /> ' be adjusted during the day based on pavement temperature, surface texture, and <br /> dryness. <br /> The paving mixture shall be spread to fill minor cracks and shallow potholes and leave a <br /> uniform surface. Care shall be taken when rut filling to restore the designed profile of <br /> the pavement cross section. Excess crowning (over-filling) of rut areas shall be avoided. <br /> A sufficient amount of material shall be carried at all times in all parts of the spreader <br /> box to ensure complete coverage. Overloading of the spreader shall be avoided. No <br /> lumps or uncoated aggregate will be permitted in the finished surface. <br /> iAdjustments to the mix design may be required during construction, based on field <br /> conditions. The percent of mineral filler in the mix design may be increased or <br /> decreased by less than 0.3 percent when the slurry seal is being placed if it is found to <br /> be necessary for better consistency or set times. The Engineer will give final approval <br /> for all adjustments. <br /> (b) Mix Consistency_ The finished product shall be uniform in color and composition. No <br /> streaks, such as those caused by oversized aggregate, shall be left in the finished <br /> surface. If excess streaking develops, the job will be stopped until the Contractor proves <br /> to the Engineer that the situation has been corrected. Excessive streaking is defined as <br /> more than four drag marks greater than 1/2 in. (13 mm) wide and 4 in. (100 mm) long, or <br /> 1 in. (25 mm) wide and 3 in. (75 mm) long, in any 30 sq yd (25 sq m) area. No <br /> transverse ripples or longitudinal streaks of 0.25 in. (6 mm) in depth will be permitted, <br /> when measured by placing a 10 ft (3 m) straightedge over the surface. <br /> ' (c) Mix Stability. The micro-surfacing shall possess sufficient stability so that premature <br /> breaking of the material in the spreader box does not occur. The mixture shall be <br /> homogeneous during and following mixing and spreading. It shall be free of excess <br /> 1 water or emulsified asphalt and free of segregation of the emulsified asphalt and <br /> aggregate fines from the coarser aggregate. Under no circumstances shall water be <br /> sprayed directly into the lay-down box while placing micro-surfacing material. <br /> ' (d) Joints and Edges. The Contractor shall devise a joint plan according to ISSA A143 and <br /> submit to the Engineer for approval. When practical, the surface course joint shall be at <br /> least 10 in. (255 mm) away from the nearest edge of any subsequent permanent <br /> pavement markings. <br /> Micro-surfacing edges shall be parallel with the existing pavement edges. If the existing <br /> pavement edge cannot be used to give a straight edge, a stringline or other guide will be <br /> required. Edge lines shall not vary by more than ± 2 in. (50 mm) horizontally in any <br /> 100 ft (30 m) of length. <br />