Laserfiche WebLink
(1) Micro-Surfacing Rut Filling. Micro-surfacing rut filling will be measured for payment <br /> in place in feet (meters) along the wheel path or filled rut. <br /> (2) Micro-surfacing, Single Pass. Micro-surfacing, single pass will be measured for <br /> payment in place and the area computed in square yards (square meters). The <br /> width for measurement will be the width of the top surface as shown on the plans or <br /> as directed by the Engineer. <br /> Prime coat, when required, will be measured for payment according to Article 406.13(b) <br /> of the Standard Specifications. <br /> Basis of Payment. Crack/joint sealing will be paid for at the contract unit price per foot (meter) <br /> of FIBER-MODIFIED ASPHALT CRACK SEALING. <br /> Bump removal will be paid for at the contract unit price per each for BUMP REMOVAL. <br /> Pavement marking removal and pavement marker removal will be paid for according to <br /> Article 783.06 of the Standard Specifications. <br /> Rut filling will be paid for at the contract unit price per foot (meter) for MICRO-SURFACING RUT <br /> FILLING. <br /> Micro-surfacing, single pass will be paid for at the contract unit price per square yard (square <br /> meter) for MICRO-SURFACING, SINGLE PASS, of the gradation type and friction aggregate <br /> mixture specified. <br /> Prime coat, when required, will be paid for according to Article 406.14 of the Standard <br /> Specifications: <br /> 80220 <br />