My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
R2012-130 AUTHORIZING AN AGREEMENT WITH HANSON PROFESSIONAL SERVICES, INC.
COD
>
City Clerk
>
RESOLUTIONS
>
2012
>
R2012-130 AUTHORIZING AN AGREEMENT WITH HANSON PROFESSIONAL SERVICES, INC.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/20/2015 3:19:32 PM
Creation date
8/20/2015 3:19:24 PM
Metadata
Fields
Template:
Resolution/Ordinance
Res Ord Num
R2012-130
Res Ord Title
AUTHORIZING AN AGREEMENT WITH HANSON PROFESSIONAL SERVICES, INC. FOR ENGINEERING SERVICES TO PREPARE PERMITS AND DESIGN REPAIRS TO THE TAIL WATER DAM
Department
Public Works
Approved Date
6/18/2012
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
38
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
execution of the Contract,the Consulting Engineer's clarifications and interpretations of the <br /> Contract Documents,progress reports, and other Project-related documents. <br /> C. Keep a diary or log book,recording the Contractor's hours on the job site,weather conditions, <br /> data relative to questions of Change Orders, or changed conditions, list of job site visitors, <br /> daily activities, decisions, observations in general, and specific observations in more detail, as <br /> in the case of observing test procedures and send copies to the City's Representative. <br /> d. Take multiple photographs of the Work and keep a log and file of the photos. The <br /> photographs shall be provided to the City's Representative upon demand and at project <br /> closeout. <br /> e. Record names, addresses and telephone numbers of all the Contractors, Subcontractors, and <br /> major suppliers of materials and equipment. <br /> 7. Reports. The Consulting Engineer shall, <br /> a. Furnish the City's Representative periodic reports, as required, on progress of the Work and <br /> of the Contractor's compliance with the progress schedule and schedule of Shop Drawings <br /> and sample submittals. <br /> b. Consult with the City's Representative, in advance of scheduled major tests, inspections, or <br /> start of important phases of the Work. <br /> C. Draft proposed Change Orders and obtaining back-up material from the Contractor, and make <br /> recommendations to the City's Representative regarding Change Orders and Field Orders. <br /> d. Report immediately to the City's Representative upon the occurrence of any accident. <br /> 8. Contract Interpretation; Review of Quality of Work. The Consulting Engineer shall: <br /> a. Issue all instructions of the City's Representative to the Contractor(s). <br /> b. Issue necessary interpretations and clarifications of the Contract Documents and in <br /> connection therewith prepare change orders as required, subject to the City's Representative's <br /> approval. <br /> C. Have authority, as a representative of the City,to require special inspection or testing of the <br /> work. <br /> d. Act as initial interpreter of the requirements of the Contract Documents and judge of the <br /> acceptability of the work there under and make decisions on all claims of the Contractor(s) <br /> relating to the acceptability of the work or the interpretation of the requirements of the <br /> Contract Documents pertaining to the execution and progress of the work. <br /> 9. Prepare Engineer's Pay Estimate. The Consulting Engineer shall,based on the Consulting <br /> Engineer's on-site observations as an experienced and qualified design professional and on review <br /> of the Inspectors Daily Reports and Quantity Book, determine the amounts owing to the <br /> Contractor(s) and prepare an Engineer's Payment Estimate recommending the amount of <br /> payment for completed work. Such recommendations of payment shall constitute a representation <br /> to the City's Representative,based on such observations and review, that the work has progressed <br /> to the point indicated and that to the best of the Consulting Engineer's knowledge, information <br /> and belief,the quality of such work is in accordance with the Contract Documents (subject to an <br /> evaluation of such work as a functioning Project upon Substantial Completion,to the results of <br /> any subsequent tests called for in the Contract Documents, and to any qualifications stated in his <br /> recommendation), and that payment of the amount recommended is due the Contractor(s). The <br />
The URL can be used to link to this page
Your browser does not support the video tag.