My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
R2012-130 AUTHORIZING AN AGREEMENT WITH HANSON PROFESSIONAL SERVICES, INC.
COD
>
City Clerk
>
RESOLUTIONS
>
2012
>
R2012-130 AUTHORIZING AN AGREEMENT WITH HANSON PROFESSIONAL SERVICES, INC.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/20/2015 3:19:32 PM
Creation date
8/20/2015 3:19:24 PM
Metadata
Fields
Template:
Resolution/Ordinance
Res Ord Num
R2012-130
Res Ord Title
AUTHORIZING AN AGREEMENT WITH HANSON PROFESSIONAL SERVICES, INC. FOR ENGINEERING SERVICES TO PREPARE PERMITS AND DESIGN REPAIRS TO THE TAIL WATER DAM
Department
Public Works
Approved Date
6/18/2012
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
38
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
t <br /> Engineer's Payment Estimate shall be prepared not less than monthly while construction is <br /> proceeding. The pay estimate shall be prepared on a spreadsheet form supplied by the City's <br /> Representative at the beginning of this phase of work. <br /> 10. Determination of Substantial Completion. The Consulting Engineer shall conduct an inspection <br /> to determine if the Project is substantially complete and conduct a final inspection to determine if <br /> the work has been completed in accordance with the Contract Documents and if each Contractor <br /> has fulfilled all of his obligations there under so that the Consulting Engineer may recommend, in <br /> writing,final payment to each Contractor and may give written notice to the City's <br /> Representative and the Contractor(s)that the work is acceptable(subject to any conditions therein <br /> expressed). <br /> 11. Authority and Responsibility. The Consulting Engineer shall not guarantee the work of any <br /> Contractor or Subcontractor, shall have no authority to stop work, shall have no supervision or <br /> control as to the work or persons doing the work, shall not have charge of the work, shall not be <br /> responsible for safety in, on, or about the job-site or have any control of the safety or adequacy of <br /> any equipment,building component, scaffolding, supports,forms or other work aids, and shall <br /> have no duties or responsibilities imposed by the Structural Work Act upon the "owner" under <br /> that Act and shall not be the "person in control of work" within the meaning of that Act. <br /> 12. Consulting Engineer Not Responsible for Acts of Contractor. The Consulting Engineer shall not <br /> be responsible for the supervision or control of the acts or omissions or construction means, <br /> methods or techniques of any Contractor, or Subcontractor, or any of the Contractor(s)' or <br /> Subcontractors' agents or employees or any other person(except the Consulting Engineer's own <br /> employees and agents) at the site or otherwise performing any of the Contractor(s)'work; <br /> however,nothing contained in this contract shall be construed to release the Consulting Engineer <br /> from liability for failure to properly perform duties undertaken by him in these Contract <br /> Documents or this Agreement. <br /> 13. Preparation of Record Drawings. The Consulting Engineer shall prepare a set of record plans on <br /> which shall be noted all changes which may have occurred during construction. The record <br /> drawings need not detail changes in measurements, elevation lines or grades which are within the <br /> normally accepted construction tolerances. Record drawings may be prepared using AutoCAD or <br /> other electronic plan preparation method. Alternately,record drawings may be prepared using <br /> manual methods. The plans shall be delivered to the City's Representative in the form of one set <br /> of prints and electronic file if record drawings were prepared by electronic methods. The cost of <br /> document reproduction shall be considered to be a reimbursable expense and paid in accordance <br /> with Section V(C)of this agreement. <br /> 14. Completion Time. The Consulting Engineer shall complete the Construction Inspection Phase <br /> within the time period set forth in Exhibit C,Project Timeline. <br /> SECTION III. CITY'S RESPONSIBILITIES <br /> The City shall, <br /> A. FURNISH REQUIREMENTS AND LIMITATIONS. Provide all criteria and full information as <br /> to the City's requirements for the Project, including design objectives and constraints, space, capacity <br /> and performance requirements, flexibility and expandability, economic parameters and any budgetary <br /> limitations; and furnish copies of all design and construction standards which the City will require to <br /> be included in the Drawings and Specifications. <br />
The URL can be used to link to this page
Your browser does not support the video tag.