My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
R2012-130 AUTHORIZING AN AGREEMENT WITH HANSON PROFESSIONAL SERVICES, INC.
COD
>
City Clerk
>
RESOLUTIONS
>
2012
>
R2012-130 AUTHORIZING AN AGREEMENT WITH HANSON PROFESSIONAL SERVICES, INC.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/20/2015 3:19:32 PM
Creation date
8/20/2015 3:19:24 PM
Metadata
Fields
Template:
Resolution/Ordinance
Res Ord Num
R2012-130
Res Ord Title
AUTHORIZING AN AGREEMENT WITH HANSON PROFESSIONAL SERVICES, INC. FOR ENGINEERING SERVICES TO PREPARE PERMITS AND DESIGN REPAIRS TO THE TAIL WATER DAM
Department
Public Works
Approved Date
6/18/2012
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
38
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Exhibit A <br /> SCOPE OF WORK <br /> (Describe the scope of work by breaking down the project into major work elements or phases. <br /> Further divide the major work elements or phases into tasks, identify proposed staff positions to <br /> accomplish the tasks, and show direct salary cost. Estimate the staff hours to accomplish the <br /> task, and calculate the direct cost. A sum of staff hours by position and direct salary cost should <br /> be made for each of the major work elements or phases. The total estimated labor cost is the sum <br /> of all the elements or phases multiplied by the approved project multiplier. The total estimated <br /> engineering cost is the total labor cost plus estimated reimbursable expenses. Alternately, <br /> replace this Exhibit with a spread sheet defining scope of work. Mark the spreadsheet Exhibit <br /> A.) Number pages "A-1", "A-2" and so on. <br /> The Scope of Services to be provided is limited to the following: <br /> 1. Tailwater Dam Permitting Services: <br /> Provide the following services to prepare the application for IDNR/OWR General Permit 02-01 <br /> Authorizing Certain Class III Dams: <br /> a. Survey—Use existing site survey data and perform a site visit to document existing <br /> conditions at the dam location to prepare a Dam Evaluation Report per IDNR permitting <br /> criteria. <br /> b. Hydrologic&Hydraulic Analyses—Document hydraulic performance of the tailwater <br /> dam for design frequencies. <br /> c. Operations&Maintenance Manual—Prepare documentation of the regular operation, <br /> inspection and maintenance tasks associated with the tailwater dam for the range of <br /> operating conditions. <br /> d. Geotechnical Engineering—Develop design parameters for the existing"embankment" <br /> portion of the tailwater dam. Perform stability, seepage, and uplift analyses of the <br /> embankment and concrete sections of the dam. <br /> e. Structural Engineering—Structural analysis of the existing concrete dam with the <br /> proposed repairs. Evaluate dam structure and temporary cofferdam under construction <br /> conditions. <br /> f. Environmental Assessment& Storm Water Pollution Prevention Plan(SWPPP)— <br /> Investigate wetland delineation. Prepare permit application for the U.S. Army Corps of <br /> Engineers. Prepare Notice of Intent and SWPPP for construction. <br /> g. Construction Documents—Prepare plans and specifications which illustrate the <br /> configuration of the existing earthen and concrete dam sections, and details of the <br /> proposed scour repair measures. <br /> h. Permitting—Prepare submittal of permit forms and supporting documentation for <br /> General Permit 02-01. <br /> i. Construction—Perform site visits for construction observation, as-built survey, and <br /> record drawing preparation. Prepare record drawings for submittal to IDNR/OWR. <br /> A-1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.