Laserfiche WebLink
Exhibit A <br /> SCOPE OF WORK <br /> (Describe the scope of work by breaking down the project into major work elements or phases. <br /> Further divide the major work elements or phases into tasks, identify proposed staff positions to <br /> accomplish the tasks, and show direct salary cost. Estimate the staff hours to accomplish the <br /> task, and calculate the direct cost. A sum of staff hours by position and direct salary cost should <br /> be made for each of the major work elements or phases. The total estimated labor cost is the sum <br /> of all the elements or phases multiplied by the approved project multiplier. The total estimated <br /> engineering cost is the total labor cost plus estimated reimbursable expenses. Alternately, <br /> replace this Exhibit with a spread sheet defining scope of work. Mark the spreadsheet Exhibit <br /> A.) Number pages "A-1", "A-2" and so on. <br /> The Scope of Services to be provided is limited to the following: <br /> 1. Tailwater Dam Permitting Services: <br /> Provide the following services to prepare the application for IDNR/OWR General Permit 02-01 <br /> Authorizing Certain Class III Dams: <br /> a. Survey—Use existing site survey data and perform a site visit to document existing <br /> conditions at the dam location to prepare a Dam Evaluation Report per IDNR permitting <br /> criteria. <br /> b. Hydrologic&Hydraulic Analyses—Document hydraulic performance of the tailwater <br /> dam for design frequencies. <br /> c. Operations&Maintenance Manual—Prepare documentation of the regular operation, <br /> inspection and maintenance tasks associated with the tailwater dam for the range of <br /> operating conditions. <br /> d. Geotechnical Engineering—Develop design parameters for the existing"embankment" <br /> portion of the tailwater dam. Perform stability, seepage, and uplift analyses of the <br /> embankment and concrete sections of the dam. <br /> e. Structural Engineering—Structural analysis of the existing concrete dam with the <br /> proposed repairs. Evaluate dam structure and temporary cofferdam under construction <br /> conditions. <br /> f. Environmental Assessment& Storm Water Pollution Prevention Plan(SWPPP)— <br /> Investigate wetland delineation. Prepare permit application for the U.S. Army Corps of <br /> Engineers. Prepare Notice of Intent and SWPPP for construction. <br /> g. Construction Documents—Prepare plans and specifications which illustrate the <br /> configuration of the existing earthen and concrete dam sections, and details of the <br /> proposed scour repair measures. <br /> h. Permitting—Prepare submittal of permit forms and supporting documentation for <br /> General Permit 02-01. <br /> i. Construction—Perform site visits for construction observation, as-built survey, and <br /> record drawing preparation. Prepare record drawings for submittal to IDNR/OWR. <br /> A-1 <br />