Laserfiche WebLink
PSMJ Resources,Inc v.psmj.com 1.800.537.7765(PSMJ) info@psmj.com <br /> Hanson Professional Services Inc. <br /> Lake Decatur-Tailwater Dam Permit Enter vour data in light green cells <br /> Labor Category <br /> --� Totals 82,175 3,375 234 136.40 576 65 222 15 33 62 51 122 6 <br /> PM <br /> Sr.Engr Sr.Engr Engr Engr Engr. Engr Sr.Tech Admin. <br /> Click here for Helo inserting rows Total Other Direct Costs Ave Hourly Total E/S VII E/S VI E/S V E/S IV E/S III E/S II T V AV <br /> $ CADD Other Rate Hours $187.00 $157.00 $141.00 $128.00 $118.00 $104.00 $98.00 $107.00 <br /> Task#Task Description 15 <br /> 1 Survey-Background Data _ $ <br /> 2 Site Visit/Dam Evaluation(H&H,Geotech,Structural) 1,962 $ 78 $ 157.00 12 12 <br /> 3 Survey-Crest,US&DS Face,ES,PS,Shoreline,Max Pool(completed) - $ $ <br /> 4 Plan Sheet with Dam,Lake and Appurtenant Structures(completed) - $ $ <br /> 5 Dam Evaluation Report with Recommendations 5,238 $ $ 154.06 34 32 2 <br /> 6 QA/QC-survey&report 628 $ $ 157.00 4 4 <br /> 7 Determine typical sections from survey and underwater inspection data 588 $ $ 98.00 6 6 <br /> 8 $ <br /> 10 Hydrologic and Hydraulic Analysis - $ <br /> 11 Adjust Weir Coefficients in current HEC model 157 $ $ 157.00 1 1 <br /> 12 Run Models 157 $ $ 157.00 1 1 <br /> 13 Develop Velocity Distributions 314 $ $ 157.00 2 2 <br /> 14 Upstream Face Protection-Riprap sizing 628 $ $ 157.00 4 4 <br /> 15 Downstream Energy Dissipation/Erosion Protection-Riprap sizing 628 $ $ 157.00 4 4 <br /> 16 Critical Location Erosion Protection 942 $ $ 157.00 6 6 <br /> 17 Dewatering Computations 628 $ $ 157.00 4 4 <br /> 18 PMF Alternative Spillway Design(Class II&III dams) 628 $ $ 157.00 4 4 <br /> 19 H&H Design Report 1,256 $ $ 157.00 8 8 <br /> 20 Plans,Specs and Details development 1,376 $ 120 $ $ 157.00 8 8 <br /> 21 QA/QC-model,calcs,report&plans 1,256 $ $ 157.00 8 8 <br /> 22 - $ <br /> 25 Operation and Maintenance Manual - $ <br /> 26 O&M Manual Narrative 3,134 $ $ 120.54 26 8 16 2 <br /> 27 O&M Manual Exhibits(Location Map) 820 $ 90 $ $ 121.67 6 2 4 <br /> 28 IDNR Inspection Forms 628 $ $ 157.00 4 4 <br /> 29 QA/QC 628 $ $ 157.00 4 4 <br /> 32 - $ <br /> 33 Permitting _ $ <br /> 34 Downstream Floodplain Sketch 344 $ 30 $ $ 157.00 2 2 <br /> 35 Entry Authorization/Inspection Authorization Statements 157 $ $ 157.00 1 1 <br /> 36 Upstream Ownership-Documentation/Computations/Easements 344 $ 30 $ $ 157.00 2 2 <br /> 37 Reclassification Standards Statement(Class II&III dams) 157 $ $ 157.00 1 1 <br /> 38 Prepare Application for Permit Forms 628 $ $ 157.00 4 4 <br /> 39 Prepare IDNR/OWR GP 02-01 Forms 628 $ $ 157.00 4 4 <br /> 40 Coordination withlDNR/OWR 314 $ $ 157.00 2 2 <br /> 41 QA/QC 628 $ $ 157.00 4 4 <br /> 43 _ $ <br /> 44 Geotechnical $ <br /> 45 Site Visit(included in Survey-Background Section) $ <br /> 46 Subsurface Investigation-Drilling-none:soil values form main dam data $ <br /> 47 Lab Testing-none:soil values form main dam data - $ <br /> 48 Develop Embankment Design Parameters 628 $ $ 157.00 4 4 <br /> 49 Stability Anlaysis-Embankment Section(2 analysis sections) 1,256 $ $ 157.00 8 8 <br /> 50 Stability Anlaysis-Concrete Section - $ <br /> 51 Seepage&Uplift Analysis-Embankment Section(1 analysis section) 1,256 $ $ 157.00 8 8 <br /> 52 Seepage&Uplift Analysis-Concrete Section - $ <br /> 54 Report Section 1,256 $ $ 157.00 8 8 <br /> 55 QA 628 $ $ 157.00 4 4 <br /> 56 - $ <br /> H....PSMJ MSProje,L.1,l k3uJ„t I nr? <br />