My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
R2012-130 AUTHORIZING AN AGREEMENT WITH HANSON PROFESSIONAL SERVICES, INC.
COD
>
City Clerk
>
RESOLUTIONS
>
2012
>
R2012-130 AUTHORIZING AN AGREEMENT WITH HANSON PROFESSIONAL SERVICES, INC.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/20/2015 3:19:32 PM
Creation date
8/20/2015 3:19:24 PM
Metadata
Fields
Template:
Resolution/Ordinance
Res Ord Num
R2012-130
Res Ord Title
AUTHORIZING AN AGREEMENT WITH HANSON PROFESSIONAL SERVICES, INC. FOR ENGINEERING SERVICES TO PREPARE PERMITS AND DESIGN REPAIRS TO THE TAIL WATER DAM
Department
Public Works
Approved Date
6/18/2012
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
38
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PSMJ Resources,Inc v.psmj.com 1.800.537.7765(PSMJ) info@psmj.com <br /> Hanson Professional Services Inc. <br /> Lake Decatur-Tailwater Dam Permit Enter vour data in light green cells <br /> Labor Category <br /> --� Totals 82,175 3,375 234 136.40 576 65 222 15 33 62 51 122 6 <br /> PM <br /> Sr.Engr Sr.Engr Engr Engr Engr. Engr Sr.Tech Admin. <br /> Click here for Helo inserting rows Total Other Direct Costs Ave Hourly Total E/S VII E/S VI E/S V E/S IV E/S III E/S II T V AV <br /> $ CADD Other Rate Hours $187.00 $157.00 $141.00 $128.00 $118.00 $104.00 $98.00 $107.00 <br /> Task#Task Description 15 <br /> 1 Survey-Background Data _ $ <br /> 2 Site Visit/Dam Evaluation(H&H,Geotech,Structural) 1,962 $ 78 $ 157.00 12 12 <br /> 3 Survey-Crest,US&DS Face,ES,PS,Shoreline,Max Pool(completed) - $ $ <br /> 4 Plan Sheet with Dam,Lake and Appurtenant Structures(completed) - $ $ <br /> 5 Dam Evaluation Report with Recommendations 5,238 $ $ 154.06 34 32 2 <br /> 6 QA/QC-survey&report 628 $ $ 157.00 4 4 <br /> 7 Determine typical sections from survey and underwater inspection data 588 $ $ 98.00 6 6 <br /> 8 $ <br /> 10 Hydrologic and Hydraulic Analysis - $ <br /> 11 Adjust Weir Coefficients in current HEC model 157 $ $ 157.00 1 1 <br /> 12 Run Models 157 $ $ 157.00 1 1 <br /> 13 Develop Velocity Distributions 314 $ $ 157.00 2 2 <br /> 14 Upstream Face Protection-Riprap sizing 628 $ $ 157.00 4 4 <br /> 15 Downstream Energy Dissipation/Erosion Protection-Riprap sizing 628 $ $ 157.00 4 4 <br /> 16 Critical Location Erosion Protection 942 $ $ 157.00 6 6 <br /> 17 Dewatering Computations 628 $ $ 157.00 4 4 <br /> 18 PMF Alternative Spillway Design(Class II&III dams) 628 $ $ 157.00 4 4 <br /> 19 H&H Design Report 1,256 $ $ 157.00 8 8 <br /> 20 Plans,Specs and Details development 1,376 $ 120 $ $ 157.00 8 8 <br /> 21 QA/QC-model,calcs,report&plans 1,256 $ $ 157.00 8 8 <br /> 22 - $ <br /> 25 Operation and Maintenance Manual - $ <br /> 26 O&M Manual Narrative 3,134 $ $ 120.54 26 8 16 2 <br /> 27 O&M Manual Exhibits(Location Map) 820 $ 90 $ $ 121.67 6 2 4 <br /> 28 IDNR Inspection Forms 628 $ $ 157.00 4 4 <br /> 29 QA/QC 628 $ $ 157.00 4 4 <br /> 32 - $ <br /> 33 Permitting _ $ <br /> 34 Downstream Floodplain Sketch 344 $ 30 $ $ 157.00 2 2 <br /> 35 Entry Authorization/Inspection Authorization Statements 157 $ $ 157.00 1 1 <br /> 36 Upstream Ownership-Documentation/Computations/Easements 344 $ 30 $ $ 157.00 2 2 <br /> 37 Reclassification Standards Statement(Class II&III dams) 157 $ $ 157.00 1 1 <br /> 38 Prepare Application for Permit Forms 628 $ $ 157.00 4 4 <br /> 39 Prepare IDNR/OWR GP 02-01 Forms 628 $ $ 157.00 4 4 <br /> 40 Coordination withlDNR/OWR 314 $ $ 157.00 2 2 <br /> 41 QA/QC 628 $ $ 157.00 4 4 <br /> 43 _ $ <br /> 44 Geotechnical $ <br /> 45 Site Visit(included in Survey-Background Section) $ <br /> 46 Subsurface Investigation-Drilling-none:soil values form main dam data $ <br /> 47 Lab Testing-none:soil values form main dam data - $ <br /> 48 Develop Embankment Design Parameters 628 $ $ 157.00 4 4 <br /> 49 Stability Anlaysis-Embankment Section(2 analysis sections) 1,256 $ $ 157.00 8 8 <br /> 50 Stability Anlaysis-Concrete Section - $ <br /> 51 Seepage&Uplift Analysis-Embankment Section(1 analysis section) 1,256 $ $ 157.00 8 8 <br /> 52 Seepage&Uplift Analysis-Concrete Section - $ <br /> 54 Report Section 1,256 $ $ 157.00 8 8 <br /> 55 QA 628 $ $ 157.00 4 4 <br /> 56 - $ <br /> H....PSMJ MSProje,L.1,l k3uJ„t I nr? <br />
The URL can be used to link to this page
Your browser does not support the video tag.