My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
R2012-130 AUTHORIZING AN AGREEMENT WITH HANSON PROFESSIONAL SERVICES, INC.
COD
>
City Clerk
>
RESOLUTIONS
>
2012
>
R2012-130 AUTHORIZING AN AGREEMENT WITH HANSON PROFESSIONAL SERVICES, INC.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/20/2015 3:19:32 PM
Creation date
8/20/2015 3:19:24 PM
Metadata
Fields
Template:
Resolution/Ordinance
Res Ord Num
R2012-130
Res Ord Title
AUTHORIZING AN AGREEMENT WITH HANSON PROFESSIONAL SERVICES, INC. FOR ENGINEERING SERVICES TO PREPARE PERMITS AND DESIGN REPAIRS TO THE TAIL WATER DAM
Department
Public Works
Approved Date
6/18/2012
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
38
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
-► Totals $ 82,175 $ 3,375 $ 234 $ 136.40 576 65 222 15 33 62 51 122 6, <br /> PM <br /> Sr.Engr Sr.Engr Engr Engr Engr. Engr Sr.Tech Admin. <br /> Click here for Help inserting rows Total Other Direct Costs Ave Hourly Total E/S VII E/S VI E/S V E/S IV E/S III E/S II T V AV <br /> $ CADD Other Rate Hours $187.00 $157.00 $141.00 $128.00 $118.00 $104.00 $98.00 $107.00 <br /> 57 Structural $ <br /> 58 Site Visit(included in Survey-Background Section) - $ <br /> 59 Sliding and Stability Analyses(4 cases) 2,658 $ $ 147.67 18 6 12 <br /> 60 Foundation Analyses(with and w/o piles) 886 $ $ 147.67 6 2 4 <br /> 61 Internal Structural Analyses(failure along construction joint or through stem 827 $ $ 137.83 6 1 5 <br /> 62 OA 1,122 $ $ 187.00 6 6 <br /> 63 Summary for Report 748 $ $ 187.00 4 4 <br /> 64 Cofferdam Design(typical section and tie-ins) 2,760 $ 240 $ $ 157.50 16 8 8 <br /> 65 Evaluate existing structure under construction conditions 2,424 $ 180 $ $ 187.00 12 12 <br /> 69 - $ <br /> 70 Environmental Assessment&Permitting&SWPPP - $ <br /> 71 Map review and preparation 532 $ 60 $ $ 118.00 4 4 <br /> 72 Site meeting/wetland delineation 1,516 $ 150 $ 78 $ 128.80 10 1 1 8 <br /> 73 Prepare USACE permit application 3,688 $ $ 122.93 30 1 1 4 24 <br /> 74 Prepare NOI and SWPPP for construction 3,520 $ $ 125.71 28 2 2 24 <br /> 75 - $ <br /> 76 Construction Documents - $ - <br /> 77 Plans&Specifications 16,722 $ 1,890 $ $ 117.71 126 12 24 90 <br /> 80 $ - <br /> 81 Construction - $ <br /> 82 Site Visits/Construction Observation 2,370 $ 78 $ 114.60 20 4 16 <br /> 83 As-Built Survey 5,722 $ 225 $ $ 119.50 46 4 15 15 10 2 <br /> 84 Record Drawings 3,184 $ 360 $ $ 117.67 24 8 16 <br /> 85 Reports 628 $ $ 157.00 4 4 <br /> 86 QA/QC 314 $ $ 157.00 2 2 <br /> 87 Record Drawing Submittal to IDNR/OWR 314 $ $ 157.00 2 2 <br /> 90 - $ <br /> 91 Project Management - $ <br /> 92 Status Meetings/Calls 924 $ $ 154.00 6 2 2 2 <br /> 93 Coordination,Financial/Invoice,Schedule 1,496 $ $ 187.00 8 8 <br /> 94 - $ <br /> 100 _ $ - <br /> Total 82,175 3,375 234 136.40 576 65 222 15 33 62 51 122 6 <br /> Inserting rows-do not simply insert new rows,you must also copy the formulas doi see S-Table Help for details <br /> Click here for Help inserting rows <br /> Han onPSMJ_MSProjeotxls 2 Budget ?„� <br />
The URL can be used to link to this page
Your browser does not support the video tag.