My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
R2012-116 ACCEPTING THE BID AND AUTHORIZING CONTRACT
COD
>
City Clerk
>
RESOLUTIONS
>
2012
>
R2012-116 ACCEPTING THE BID AND AUTHORIZING CONTRACT
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/21/2015 8:19:57 AM
Creation date
8/21/2015 8:19:38 AM
Metadata
Fields
Template:
Resolution/Ordinance
Res Ord Num
R2012-116
Res Ord Title
ACCEPTING THE BID AND AUTHORIZING THE EXECUTION OF A CONTRACT FOR 2012 MISCELLANEOUS STORM AND SANITARY SEWER IMPROVEMENT PROJECT
Department
Public Works
Approved Date
5/21/2012
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
92
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
GENERAL CONDITIONS <br /> GC-14 LOCATION OF UTILITIES <br /> Prior to commencing construction, the Contractor shall contact JULIE (1-800-892-0123), <br /> and those agencies listed below to secure utility locations and data: <br /> City of Decatur (JULIE Member) <br /> Ameren Illinois (JULIE Member) <br /> AT&T (JULIE Member) <br /> Comcast (JULIE Member) <br /> The Contractor shall be held responsible for protecting all utilities and in the event the <br /> contractor damages any of them, they shall be replaced by the Contractor to the satisfaction of <br /> the utility owner at their own expense. <br /> GC-15 MEASUREMENT AND PAYMENT <br /> Payment shall be made only for those items listed in the Schedule of Prices in the <br /> Contractor's proposal, except as extra work may be directed by the Engineer, in writing, during <br /> construction. Miscellaneous items of work not specifically listed in the Contractor's proposal <br /> shall be considered incidental to the contract work and the cost thereof shall be included in the <br /> appropriate contract bid item. <br /> GC-16 METHOD OF PAYMENT <br /> Requests for partial payment may be submitted, in writing, at least once each month by <br /> the Contractor to the Engineer. Requests shall make an approximate estimate of the materials in <br /> place complete, the amount of work performed, and the value thereof, at the contract unit prices. <br /> Copies of the certified payroll for employees of the Contractor and for the respective <br /> subcontractors should be submitted with the request. Copies of the invoices for materials and <br /> equipment actually on the job site for which payment is requested by the Contractor shall be <br /> included in the request. <br /> Payments by the City will be equal to the approved partial payment amount, less <br /> retainage in accordance with Section 109.07 of the Illinois Department of Transportation <br /> Standard Specifications for Road and Bridge Construction, adopted January 1, 1997. Retainage <br /> will be released to the Contractor upon satisfactory completion of the work and shall be used for <br /> necessary adjustments to the pay schedule which may result from irregularities, substitutions or <br /> changes. <br /> i <br /> 1 <br /> 28 , <br />
The URL can be used to link to this page
Your browser does not support the video tag.