My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
R2012-116 ACCEPTING THE BID AND AUTHORIZING CONTRACT
COD
>
City Clerk
>
RESOLUTIONS
>
2012
>
R2012-116 ACCEPTING THE BID AND AUTHORIZING CONTRACT
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/21/2015 8:19:57 AM
Creation date
8/21/2015 8:19:38 AM
Metadata
Fields
Template:
Resolution/Ordinance
Res Ord Num
R2012-116
Res Ord Title
ACCEPTING THE BID AND AUTHORIZING THE EXECUTION OF A CONTRACT FOR 2012 MISCELLANEOUS STORM AND SANITARY SEWER IMPROVEMENT PROJECT
Department
Public Works
Approved Date
5/21/2012
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
92
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
GENERAL CONDITIONS <br /> GC-17 PERMITS <br /> It is the Contractor's responsibility to obtain all necessary permits. Any costs incurred in <br /> obtaining these permits are to be incidental to the related contract item. Permit fees will be <br /> waived for those permits issued by the City of Decatur. <br /> GC-18 PHOTOGRAPHS OF EXISTING CONDITIONS <br /> The Contractor shall provide DVD or Digital video of existing facilities along the route <br /> or area of all construction,prior to the start of such construction. Construction of this facility <br /> will generally be along street right-of-way containing trees,bushes, fences, driveways and <br /> similar items. Special attention shall be given to coverage of the entire easement and immediate <br /> adjacent areas which might be disturbed during construction. <br /> The video shall be adequate to serve as a basis for comparison in determining whether the <br /> terms of the specifications with respect to replacements,restoration and/or preservation of <br /> existing surfaces have been complied with. One print of the video taken shall be given to the <br /> Engineer for his files. The cost for this item shall be included in the respective prices for the <br /> various items of work. <br /> GC-19 PREVAILING WAGE RATES <br /> The Contractor shall supply the Engineer with weekly certified copies of the payroll for <br /> both the prime Contractor and their subcontractors. The Engineer will monitor the payroll for <br /> compliance with the applicable "prevailing wage rates" as required by the Special Conditions of <br /> this contract. <br /> GC-20 PROJECT MAINTENANCE <br /> Should the City become aware of an unsafe condition existing within the scope of this <br /> project, the City will attempt to contact the Contractor to resolve the unsafe condition. However, <br /> if the City is unable to contact the Contractor's designated representative or if the Contractor fails <br /> to respond within a reasonable period, the City will perform the necessary operations and the <br /> cost for labor, equipment and materials will be deducted from the contract. <br /> 29 <br />
The URL can be used to link to this page
Your browser does not support the video tag.