My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
R2012-116 ACCEPTING THE BID AND AUTHORIZING CONTRACT
COD
>
City Clerk
>
RESOLUTIONS
>
2012
>
R2012-116 ACCEPTING THE BID AND AUTHORIZING CONTRACT
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/21/2015 8:19:57 AM
Creation date
8/21/2015 8:19:38 AM
Metadata
Fields
Template:
Resolution/Ordinance
Res Ord Num
R2012-116
Res Ord Title
ACCEPTING THE BID AND AUTHORIZING THE EXECUTION OF A CONTRACT FOR 2012 MISCELLANEOUS STORM AND SANITARY SEWER IMPROVEMENT PROJECT
Department
Public Works
Approved Date
5/21/2012
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
92
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SPECIAL PROVISIONS <br /> The following Standard Specifications shall be used for this project: <br /> The Illinois Department of Transportation (IDOT) "Standard Specifications for Road and <br /> Bridge Construction", current edition. <br /> The City of Decatur, Department of Public Works, Engineering Division "Construction <br /> Standards", dated January 1, 2003. <br /> ' "Standard Specifications for Water and Sewer Main Construction in Illinois", current <br /> edition. <br /> The"Illinois Urban Manual"current version in effect on the date of invitation for bids <br /> SP-1 DESCRIPTION OF WORK <br /> The proposed improvement, 2012 Miscellaneous Storm and Sanitary Sewer Improvement <br /> Project, designated as City Project 2012-09, consists of installing new manholes, inlets, and <br /> repairing damaged sections of sewer as required by the City. Sewer payment schedules have <br /> been provided to allow miscellaneous sewer repair work in addition to rapid response sewer <br /> ' repair work as requested by the City. Specific miscellaneous work items have not been <br /> identified and will be determined by the Engineer upon award of the contract and as required. <br /> Approximately two thirds (2/3) of the project is anticipated to be of an emergency (rapid <br /> response) nature. The contractor will be expected to be on-call to perform all requested rapid <br /> response sewer work for the City throughout the duration of this project. <br /> SP-2 CONSTRUCTION SCHEDULE AND COMPLETION DATE <br /> A completion date of June 1, 2013, has been established for this contract as set forth in <br /> ' Section 108 of the Standard Specifications for Road and Bridge Construction to complete the <br /> sewer work identified in this contract. All applicable provisions of Section 108 shall apply. <br /> All miscellaneous sewer repairs shall be completed within 10 calendar days after the <br /> Engineer orders the work to be done. Failure to complete miscellaneous repairs within 10 <br /> calendar days will result in liquidated damages per calendar day as specified in 108.09 of the <br /> ' Standard Specifications for Road and Bridge Construction based on the estimated cost of the <br /> identified work. If the quantity or scope of miscellaneous work cannot realistically be completed <br /> within 10 calendar days, the Contractor shall provide a schedule for the approval of the Engineer. <br /> Upon approval by the Engineer, the schedule will be binding upon the Contractor in accordance <br /> with Section 108 of the Standard Specifications. <br /> All rapid response sewer repair work identified by the Engineer shall be substantially <br /> completed or stabilized to the satisfaction of the City Engineer within 1 working day after the <br /> Engineer orders the work to be done. <br /> Unless an extension is granted and allocated funds are not expended, this project shall <br /> end on June 1,2013. <br /> 43 <br />
The URL can be used to link to this page
Your browser does not support the video tag.