Laserfiche WebLink
SPECIAL PROVISIONS ' <br /> SP-3 TRENCH BACKFILL FOR SEWERS ' <br /> Description: This work will consist of providing all labor, equipment, tools, materials <br /> etc. required to excavate the trench to the necessary elevation and to place and compact bedding, <br /> haunching, initial backfill and final trench backfill material required to construct sanitary sewers <br /> in accordance with Section 20 of the "Standard Specifications for Water and Sewer Main <br /> Construction in Illinois"and in accordance with the plans. <br /> Trench backfill will be provided in accordance with City Standards where indicated and ' <br /> as directed by the Engineer. <br /> Measurement for Payment: Measurement for payment for trench backfill will be made <br /> in accordance with City Standards. Backfill with excavated material, or at locations where <br /> excavated material will be allowed, will not be measured separately. Excavation, bedding, <br /> haunching, and initial backfill quantities will not be measured for payment ' <br /> Basis of Payment: All labor and materials necessary to comply with this specification <br /> will be paid for at the contract unit price per CUBIC YARD for TRENCH BACKFILL and no <br /> additional compensation will be paid. <br /> Excavation, bedding, haunching, and initial backfill quantities will be included with the , <br /> contract unit price per FOOT for SANITARY SEWER of the size and type specified. <br /> SP-4 SEEDING AND MULCHING , <br /> Description: This work will consist of re-grading, preparing the soil, applying fertilizer, , <br /> seeding, and mulch in accordance with Sections 250 and 251 of the Standard Specifications for <br /> Road and Bridge Construction. <br /> Basis of Payment: All labor and materials necessary to comply with this special i <br /> provision will be paid for at the contract unit price per ACRE for SEEDING, of class specified; <br /> and per ACRE for MULCH, of the method specified, and no additional compensation will be <br /> paid. Fertilizer application will be provided but shall not be paid for separately. <br /> SP-5 GRADING AND SHAPING DITCHES ' <br /> Description: This work will consist of providing all labor, equipment, tools, materials, <br /> transportation, services and technical competence required to grade and shape ditches. Work <br /> will mostly consist of grading and shaping ditches in tight restricted work areas, on private <br /> property,where smaller equipment must be utilized to limit the disturbance on the property. <br /> Basis of Payment: All labor and materials necessary to comply with this special ' <br /> provision will be paid for at the contract unit price per FOOT for GRADING AND SHAPING <br /> DITCHES, and per ACRE for SEEDING, of class specified; and per ACRE for MULCH, of the , <br /> method specified, or per SQUARE YARD for SODDING, and no additional compensation will <br /> be paid. Fertilizer application will be provided but shall not be paid for separately. <br /> 44 , <br />