My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
R2012-112 RESTORATION OF STREETS AND HIGHWAYS
COD
>
City Clerk
>
RESOLUTIONS
>
2012
>
R2012-112 RESTORATION OF STREETS AND HIGHWAYS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/21/2015 9:04:04 AM
Creation date
8/21/2015 9:04:03 AM
Metadata
Fields
Template:
Resolution/Ordinance
Res Ord Num
R2012-112
Res Ord Title
RESTORATION OF STREETS AND HIGHWAYS
Approved Date
5/21/2012
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
9
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Asphalt Street Improvement <br /> The first resolution appropriates $1,400,000 in MFT funds for asphalt street work which will be <br /> the proposed 2012 Street Restoration project, City Project 2012-08. The Street Restoration <br /> project is part of the annual maintenance program that generally consists of milling off a portion <br /> of an existing asphalt street surface and placing a new asphalt concrete surface course that <br /> restores the integrity of the street surface. This year's project will include reconstructing portions <br /> of Tanager Drive and Kenwood Avenue as shown on the attached maps. As with paving projects <br /> completed in the past few years, this year's project includes a significant amount of patching to <br /> repair failed street sections that are becoming more prevalent throughout the City as capital <br /> improvements devoted to pavement maintenance are reduced. The proposed street list is as <br /> follows: <br /> Street Begin End Surface Treatment Length (feet) <br /> Martin Luther King, Jr. Wood Street Lake Shore Drive Mill and Overlay 4,534 <br /> Drive <br /> Jasper Street Jasper Subway Condit Street Mill and Overlay 1,508 <br /> Meadowlark Reconstruction with <br /> Tanager Drive IL Route 48 Drive Cement Stabilized 600 <br /> Base <br /> Reconstruction with <br /> Kenwood Avenue Water Street Main Street Cement Stabilized 400 <br /> Base <br /> Total Length 7,042 <br /> Concrete Street Improvement <br /> The second resolution appropriates $350,000 in MFT funds for concrete street reconstruction <br /> work which will be the second phase of the proposed L &A Industrial Park Drive Concrete <br /> Pavement Reconstruction project, City Project 2012-11. This project will replace the north <br /> (westbound) half of the failed concrete pavement providing access to this industrial park. The <br /> work will include removing the pavement, stabilizing the base by blending it with cement and <br /> replacing it with concrete. The first half of the street was completed in 2011. <br /> POTENTIAL OBJECTION: There are no known objections to this resolution. <br /> INPUT FROM OTHER SOURCES: Illinois Department of Transportation <br /> STAFF REFERENCE: Richard Marley, Public Works Director, and Matt Newell, City <br /> Engineer. Richard Marley, will be in attendance at the City Council meeting to answer any <br /> questions of the Council on this item. <br /> Page 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.