My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
R2012-111 AUTHORIZING AN AGREEMENT WITH PHILLIP W. COCHRAN, P.E., ENGINEERING
COD
>
City Clerk
>
RESOLUTIONS
>
2012
>
R2012-111 AUTHORIZING AN AGREEMENT WITH PHILLIP W. COCHRAN, P.E., ENGINEERING
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/21/2015 9:08:39 AM
Creation date
8/21/2015 9:08:26 AM
Metadata
Fields
Template:
Resolution/Ordinance
Res Ord Num
R2012-111
Res Ord Title
AUTHORIZING AN AGREEMENT WITH PHILLIP W. COCHRAN, P.E., ENGINEERING, FOR FINAL DESIGN SERVICES FOR THE DOWNTOWN STREETSCAPE & OPEN SPACE ENHANCEMENT PROGRAM
Department
Public Works
Approved Date
5/21/2012
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
63
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I <br /> PUKP <br /> I lip w. cochran * consulting engineer <br /> May 16, 2012 <br /> Mr. Richard Marley <br /> Public Works Director <br /> City of Decatur <br /> One Gary K. Anderson Plaza <br /> Decatur, IL 62523 <br /> Re: Proposal for Decatur Downtown Streetscape & Openspace Enhancements -Central Park <br /> Streetscape <br /> Dear Mr. Marley, <br /> Thank you for allowing PWC Engineering the opportunity to continue to provide the City with <br /> engineering and surveying services for the Decatur Downtown Streetscape and Openspace <br /> Enhancements Project -Central Park Streetscape. We have estimated the hours and fees <br /> detailing our professional services for the following scope of work (exhibit A). <br /> Utility Coordination <br /> This work consists of coordination with affected utilities within the project limits to determine <br /> the impacts to their facilities. Utilities include; storm sewer, sanitary sewer, water main, power <br /> lines, communication lines and gas lines. This work includes field inspection,J.U.L.I.E. locate <br /> coordination, record drawing review, and construction conflict assistance. <br /> Topographic Surveys <br /> This work consists of the collection of topographic data for the preparation of construction <br /> plans for the proposed improvements. This work consists primarily of surveying the newly <br /> constructed Water Street sidewalks and curb and gutter. <br /> Plans &Specifications <br /> This work consists of the preparation of plans, specifications and estimates for the <br /> improvements. Spreadsheets are attached with an itemized list of tasks for each phase of the <br /> project. <br /> Project Management &Administration <br /> This work consists of assisting the City with the bidding process, including correspondence <br /> relating to bidding questions, reviewing and tabulating bids and preparation of a written <br /> recommendation to the City Council for award of the project. Also, preparation, attendance <br /> and documentation of meetings with the City. Last, managing staff, preparing project files and <br /> invoicing for services. <br /> 5130 hickory point frontage road • suite 2 • decatur, illinois 62526 • phone (217) 875-3333 • fax (217) 875-3371 <br />
The URL can be used to link to this page
Your browser does not support the video tag.