My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
R2012-111 AUTHORIZING AN AGREEMENT WITH PHILLIP W. COCHRAN, P.E., ENGINEERING
COD
>
City Clerk
>
RESOLUTIONS
>
2012
>
R2012-111 AUTHORIZING AN AGREEMENT WITH PHILLIP W. COCHRAN, P.E., ENGINEERING
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/21/2015 9:08:39 AM
Creation date
8/21/2015 9:08:26 AM
Metadata
Fields
Template:
Resolution/Ordinance
Res Ord Num
R2012-111
Res Ord Title
AUTHORIZING AN AGREEMENT WITH PHILLIP W. COCHRAN, P.E., ENGINEERING, FOR FINAL DESIGN SERVICES FOR THE DOWNTOWN STREETSCAPE & OPEN SPACE ENHANCEMENT PROGRAM
Department
Public Works
Approved Date
5/21/2012
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
63
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
EXHIBIT A A-1 <br /> Project Cost Submittal Date: 16-May-12 <br /> Decatur Downtown Streetscape&Openspace Enhancements <br /> Central Park 70.00 38.50 22.00 23.30 24.90 23.30 18.50 $18.00 $0.20 $0.10 $50.00 $35.00 <br /> PWC project#11005 Labor Multiplier: 2.9 203.00 111.65 63.80 67.57 72.21 67.57 53.65 <br /> Cochran Mann Oary McGary Stedman Chaney Sowers CADD Prints Xerox Survey Survey <br /> 11x17 8.5x11 Vehicle Instr. <br /> Labor Budget Project Project Lead Engr. Senior .Engr. Senior Survey Survey Hours <br /> Task No. Item Description Clerical sheets sheets (Days) (Hours) <br /> Billing Hours Manager Engineer Technician Technician Tech. Technician <br /> 1 Utility Coordination <br /> 1.01 Storm Sewer $135.29 1 0.5 0.5 <br /> 1.02 Sanitary Sewer $135.29 1 0.5 0.5 <br /> 1.03 Water Main $135.29 1 0.5 0.5 <br /> 1.04 Power Lines $135.29 1 0.5 0.5 <br /> 1.05 Communication Lines $135.29 1 0.5 0.5 <br /> 1.06 Gas Lines $135.29 1 0.5 0.5 <br /> 1.07 QA/QC $203.00 1 1 <br /> Labor Subtotals $1,014.71 7 4 3 <br /> Reimbursable Expenses $0.00 <br /> Total $1,014.71 <br /> 2 Topograhic Surveys <br /> 2.01 CollectTopo $1,118.24 16 8 8 1 8 <br /> 2.02 Process Survey Data $255.20 4 4 4 <br /> 2.03 Field Check $223.30 2 2 <br /> 2.04 Benchmarks&Control Points $559.12 8 1 4 4 0.5 <br /> Labor Subtotals $2,155.86 30 0 2 4 0 1 12 12 0 4 0 1.5 8 <br /> Reimbursable Expenses $427.00 $72.00 $0.00 $75.00 $280.00 <br /> Total $2,582.86 <br />
The URL can be used to link to this page
Your browser does not support the video tag.