My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
R2012-110 AUTHORIZING CHANGE ORDER NO. 1, FEUTZ CONTRACTORS, INC.
COD
>
City Clerk
>
RESOLUTIONS
>
2012
>
R2012-110 AUTHORIZING CHANGE ORDER NO. 1, FEUTZ CONTRACTORS, INC.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/21/2015 9:11:30 AM
Creation date
8/21/2015 9:11:27 AM
Metadata
Fields
Template:
Resolution/Ordinance
Res Ord Num
R2012-110
Res Ord Title
AUTHORIZING CHANGE ORDER NO. 1, FEUTZ CONTRACTORS INC. MAIN STREET STREETSCAPE ENHANCEMENT PROJECT
Department
Public Works
Approved Date
5/21/2012
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
11
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
;- D FEUTZ CONTRACTORS, INC. <br /> f GENERAL CONTRACTORS SINCE 1925 e� <br /> P.O.Box 130 <br /> PARIS,ILLINOIS 61944 Ss" <br /> (217)465-8402 gin <br /> FAX(217)463-2256 "'`—`.. �`f Ns ��*!o••+ <br /> AN EQUAL OPPORTUNITY EMPLOYER <br /> We provide this proposal with the following clarifications with regard to work in the Sams <br /> Hockaday Building.- <br /> 1. <br /> uilding:1. The existing building canopy over the sidewalk on W. Prairie and N. Main will be <br /> removed by others prior to our starting work. <br /> 2. All interior utility relocation work, including but not limited to electrical conduit and <br /> electrical panel relocations, water line relocations, gas line relocations, and others that <br /> may be encountered are to be relocated by others prior to our starting work. <br /> 3. Should removal work encounter materials that later are found to be hazardous, <br /> including but not limited to asbestos or other hazardous material, this work will be <br /> deemed a changed condition requiring an adjustment in pricing. It is my understanding <br /> that an asbestos abatement company was on the site on Friday, April 6, 2012 to test <br /> plaster on the interior clay wall in the vault. We have not received those test results at <br /> the writing of this letter. <br /> 4. The new interior wall is based on providing 12" CMU grouted solid per the detail on plan <br /> sheet WPC-6. <br /> Should you need additional clarification after you have reviewed this letter and proposal, <br /> please do not hesitate to contact either Ryan Huttes or me. <br /> Sincerely, <br /> Feutz Contractors, Inc. <br /> �.. Steve a <br /> J. Steve Blair, P.E. <br /> CEO <br /> Encl: Bid Proposal — West Prairie Street Change Order <br /> PAGE 2 of 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.