R2012-102 AUTHORIZING AN AGREEMENT WITH BLANK, WESSELINK, COOK & ASSOCIATES
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/21/2015 9:30:04 AM
Creation date
8/21/2015 9:29:57 AM
Metadata
Fields
Template:
Resolution/Ordinance
Res Ord Num
R2012-102
Res Ord Title
AUTHORIZING AN AGREEMENT WITH BLANK, WESSELINK, COOK & ASSOCIATES, FOR PHASE 1 OF THE NELSON PARK NEIGHBORHOOD STORM SEWER DESIGN
Department
Public Works
Approved Date
5/7/2012
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
42
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
BACKGROUND: <br /> In 1966, Warren &Van Praag, Inc. prepared a drainage study for the City of Decatur that <br /> examined the City's flooding problems and attempted to plan for drainage needs in future <br /> developments. Then, in the late 1970's and early 1980's, the City invested $19.75 million in <br /> drainage improvements throughout the City. The part of Nelson Park Neighborhood that is <br /> bound by 22nd Street on the west, Wood Street on the north, Nelson Boulevard on the east and <br /> Powers Boulevard on the south was included in this drainage study. A map of the area can be <br /> found in Figure 1 of this memorandum. When the 1966 report was written, numerous residences <br /> along nearly every street in the area reported street and basement flooding. This project was <br /> never constructed. <br /> It should come as no surprise that the flooding problems that existed in 1966 have not gone <br /> away. When the City completed the Stormwater Master Plan in 2009 with Clark Dietz, Inc., the <br /> Nelson Park Neighborhood was again included as an area that was experiencing storm drainage <br /> related problems. The area is one of the highest priorities in the Master Plan's list of 46 problem <br /> areas. The total estimated project costs in the 2009 Stormwater Master Plan $380,000. <br /> Due to expected construction costs being higher than funds available, the Nelson Park <br /> Neighborhood storm sewer project is planned to be completed in two phases. The first phase <br /> would construct an outlet for the system from Lake Decatur to the neighborhood. The second <br /> phase would construct a storm sewer system in the neighborhood. The preliminary estimated <br /> project cost of Phase I is approximately $700,000. <br /> City staff extended an invitation to the following four local civil engineering consultants to <br /> interview for the drainage related project for FY 2012/2013. Interviews were held on March 28, <br /> 2012: <br /> 1. Bainbridge, Gee, Milanski &Associates, Inc. of Decatur, IL <br /> 2. SKS Engineers & Associates, Inc. of Decatur, IL <br /> 3. Onsite Engineering, LLC of Decatur, IL <br /> 4. Blank, Wesselink, Cook&Associates, Inc. (BWC) of Decatur, IL <br /> Staff believes that BWC understands the requirements of this project and is the best qualified to <br /> perform this design. BWC has the resources available to complete the final design and prepare <br /> bid documents for the first phase of this project by September 2012. Preliminary Engineering of <br /> the second phase of the work is expected to be completed by the end of 2012. <br /> Scope of Services <br /> Staff has negotiated a scope of services and contract amount with BWC. The proposed contract <br /> amount of$80,513 is about 12%of the preliminary cost estimate of Phase 1. The project <br /> objective is to provide design and construction drawings to restore the first phase of the northeast <br /> drainage ditch to its original size and slope. Major work items of the project are: <br /> 1. Topographic Survey of the project area <br /> 2. Hydrology and Hydraulic Analysis <br /> Page 12 <br />