My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
R2012-101 AUTHORIZING AN AGREEMENT WITH ONSITE ENGINEERING, LLC
COD
>
City Clerk
>
RESOLUTIONS
>
2012
>
R2012-101 AUTHORIZING AN AGREEMENT WITH ONSITE ENGINEERING, LLC
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/21/2015 9:33:33 AM
Creation date
8/21/2015 9:33:27 AM
Metadata
Fields
Template:
Resolution/Ordinance
Res Ord Num
R2012-101
Res Ord Title
AUTHORIZING AN AGREEMENT WITH ONSITE ENGINEERING, LLC, FOR DESIGN SERVICES FOR THE FIRST PHASE OF THE NORTHEAST DRAINAGE DITCH RESTORATION PROJECT
Department
Public Works
Approved Date
5/7/2012
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
35
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Northeast Drainage Ditch Restoration - Phase 1 April 23, 2012 <br /> Scope of Services- Onsite Engineering, LLC Page A-3 of 6 <br /> Final Design Phase: Construction Plan & Specification Preparation <br /> Task Description <br /> 1 Prepare Plan and Profile Sheets for the extent of the project limits at a <br /> scale no smaller than 1" = 100 when plotted 22"04". <br /> a. Show all property lines and easement lines. <br /> b. Define limits of improvements to be made based on baseline <br /> station and offset inforination. <br /> c. Define elevations of improvements to be made based on vertical <br /> profile utilizing as-built design elevations and benchmarks <br /> established on the Record drawings. <br /> d. Show all existing structures and any adjustments required. <br /> e. Show all existing trees and removal limits. <br /> f. Show all documented eroded areas and mitigation measures. <br /> 2 Prepare Cross Section Sheets <br /> a. Show proposed and existing cross sections at 100 foot intervals <br /> (approx 96 sections) and select locations based on baseline <br /> stationing and cross sections from the Record Drawings and the <br /> 2012 Topographic Survey. <br /> b. Calculate earthwork required at each cross section. <br /> 3 Prepare Miscellaneous Design Details <br /> a. Prepare details showing the required modifications to the existing <br /> drainage structures. <br /> 4 Prepare Storm Water Pollution Prevention Plan and Permits <br /> a. Show temporary measures required. <br /> b. Show permanent measures to be provided. <br /> c. Assist the City of Decatur with the Permit forms. <br /> 5 Prepare Summary and Schedule of Quantities in IDOT format <br /> 6 Prepare Technical Specifications <br /> 7 Prepare Engineer's Estimate of Construction Cost <br />
The URL can be used to link to this page
Your browser does not support the video tag.