.- <br /> BACKGROUND: <br /> In 1966, Warren&Van Praag, Inc. prepared a drainage study for the City of Decatur that examined <br /> the City's flooding problems and attempted to plan for drainage needs in future developments. <br /> Then, in the late 1970's and early 1980's, the City invested $19.75 million in drainage <br /> improvements throughout the City. The Northeast Drainage Ditch was recommended in that 1966 <br /> study and was then constructed by a series of construction projects. The ditch begins at Spring <br /> Creek,just south of Mound Road and just east of the current Lutheran School Association property. <br /> The ditch then extends south past Pershing Road. From there, the ditch extends south to Garfield <br /> Avenue. Another extension of the ditch runs east to 276' Street. A map of the ditch can be found in <br /> Figure 1. <br /> Since its construction,the ditch has been minimally maintained and efforts are usually reactive in <br /> nature. City crews mow the portion of the drainage ditch that can be reached safely; however, city <br /> crews cannot remove sediment or large debris that accumulates in the channel. In 2009, the City <br /> contracted with Barr&Robison to remove a blockage from a flow control structure and clean <br /> approximately 2,400 ft of the Northeast Drainage Ditch north of Hubbard Avenue. This year, the <br /> City contracted with Entler Excavating Company, Inc. to remove two large beaver dams in the ditch <br /> at Hubbard Avenue. Private industries have also cleaned portions of the ditch at their own expense <br /> in an attempt to improve drainage on their property. <br /> The Northeast Drainage Ditch was designed to provide drainage of approximately 3 square miles of <br /> the City's northeast side, including several large industries such as Caterpillar and ADM. The <br /> restoration of the northeast drainage ditch will return the ditch to its original design capacity. The <br /> extent of restoration required is large and the project has been divided into two phases. Phase 1 will <br /> include that portion of the Northeast Drainage Ditch from Basin 1 to the north and from Basin 1 to <br /> the east. The limits of this phase are shown in Figure 2. Phase 2 will include that portion south of <br /> Basin 1, including Basin 2 and Basin 3. <br /> City staff extended an invitation to the following four local civil engineering consultants to <br /> interview for the drainage related project for FY 2012/2013. Interviews were held on March 28, <br /> 2012: <br /> 1. Bainbridge, Gee, Milanski &Associates, Inc. of Decatur, IL <br /> 2. SKS Engineers &Associates, Inc. of Decatur, IL <br /> 3. Onsite Engineering, LLC of Decatur, IL <br /> 4. Blank, Wesselink, Cook&Associates, Inc. of Decatur, IL <br /> Staff believes that Onsite Engineering, LLC understands the requirements of this project and is the <br /> best qualified to perform this design quickly and efficiently. Onsite Engineering has the resources <br /> available to complete the design and prepare bid documents for the first phase of this project by <br /> August 2012. <br /> Page 12 <br />