Laserfiche WebLink
The Consulting Engineer expressly acknowledges, recognizes and agrees that the only authority to <br /> approve change orders to this Agreement or the Scope or Services or the cost(s)therein is with the <br /> City Council of the City. <br /> SECTION II. BASIC SERVICES <br /> A. STUDY AND REPORT PHASE. <br /> This work was completed under the Critical Sewer Facilities Plan, City Project 2011-03 <br /> B. PRELIMINARY DESIGN PHASE. <br /> This work was completed under the Critical Sewer Facilities Plan, City Project 2011-03 <br /> C. FINAL DESIGN PHASE. <br /> The Consulting Engineer shall, after written authorization to proceed with the Final Design Phase: <br /> 1. Drawings and Specifications. Utilizing and using the preliminary design documents and <br /> preliminary design opinion of probable Project costs as approved by the City's Representative, <br /> prepare for incorporation in the Contract Documents final drawings to show the character and <br /> extent of the Project("Drawings")and specifications (Specifications"). Specific requirements of <br /> the aforementioned Drawings and Specifications are included in Exhibit A, Scope of Services. <br /> 2. Approvals of Governmental Entities. Furnish to the City's Representative such documents and <br /> design data as may be required for,and assist in the preparation of, the required documents so <br /> that the City may apply for approvals of such governmental authorities as have jurisdiction over <br /> design criteria applicable to the Project, and assist in obtaining such approvals by participating in <br /> submissions to and negotiations with appropriate authorities. <br /> 3. Adjusted Project Costs. Advise the City's Representative of any adjustments to the latest opinion <br /> of probable Project Costs caused by changes in extent or design requirements of the Project or <br /> construction costs and furnish a revised opinion of probable Project Cost based on the Drawings <br /> and Specifications. Project Costs include construction cost, contingencies, allowances for charges <br /> of all professionals and consultants, allowances for the cost of land and rights-of-way, allowances <br /> for the relocation of utility facilities and equipment if necessary, and allowances for <br /> compensation for damages to properties and interest and financing charges. <br /> 4. Contract Document Preparation. Complete preparation of the construction contract documents. <br /> The City's Representative may provide the Consulting Engineer with previously prepared <br /> Technical Specifications which may be used as appropriate. The Consulting Engineer shall, to <br /> the maximum extent possible, follow the formats for Technical Specifications as provided by the <br /> City's Representative. <br />