My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
R2012-96 AUTHORIZING AN AGREEMENT WITH BAINBRIDGE, GEE, MILANSKI AND ASSOCIATES, INC.
COD
>
City Clerk
>
RESOLUTIONS
>
2012
>
R2012-96 AUTHORIZING AN AGREEMENT WITH BAINBRIDGE, GEE, MILANSKI AND ASSOCIATES, INC.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/21/2015 10:08:42 AM
Creation date
8/21/2015 10:08:35 AM
Metadata
Fields
Template:
Resolution/Ordinance
Res Ord Num
R2012-96
Res Ord Title
AUTHORIZING AN AGREEMENT WITH BAINBRIDGE, GEE, MILANSKI AND ASSOCIATES, INC. TO DESIGN THE LAKE SHORE DRIVE SEWER REHABILITATION
Department
Public Works
Approved Date
5/7/2012
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
36
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
5. Document Presentation.' Furnish paper copies and digital copies in the number and format <br /> specified in Exhibit A, Scope of Work and present and review in person with the City as the <br /> City's Representative shall direct. The cost of document reproduction shall be considered to be a <br /> reimbursable expense and paid in accordance with Section V(C)of this Agreement. <br /> 6. Completion Time. The Final Drawings and Specifications shall be completed, submitted and <br /> approved by the City's Representative within the time period set forth in Exhibit C,Project <br /> Timeline. <br /> D. BIDDING PHASE. <br /> This work is not included under this service agreement. <br /> E. CONSTRUCTION SURVEY AND LAYOUT PHASE. <br /> This work is not included under this service agreement. <br /> F. CONSTRUCTION INSPECTION PHASE. <br /> This work is not included under this service agreement. <br /> SECTION III. CITY'S RESPONSIBILITIES <br /> The City shall, <br /> A. FURNISH REQUIREMENTS AND LIMITATIONS. Provide all criteria and full information as <br /> to the City's requirements for the Project, including design objectives and constraints, space, capacity <br /> and performance requirements, flexibility and expandability, economic parameters and any budgetary <br /> limitations; and furnish copies of all design and construction standards which the City will require to <br /> be included in the Drawings and Specifications. <br /> B. FURNISH INFORMATION. Assist the Consulting Engineer by placing at the Consulting <br /> Engineer's disposal all available information pertinent to the Project including previous reports and <br /> any other data relative to design or construction of the Project. <br /> C. FURNISH TECHNICAL INFORMATION. Furnish to the Consulting Engineer, as required for <br /> performance of the Consulting Engineer's Basic Services(except to the extent provided otherwise in <br /> Exhibit A, "Scope of Work"), data prepared by or services of others, including without limitation, <br /> core borings, probings and subsurface explorations,hydrographic surveys, laboratory tests and <br /> inspections of samples, materials and equipment; appropriate professional interpretations of all of the <br /> foregoing; environmental assessment and impact statements; property, boundary, easement, right-of- <br /> way, topographic and utility surveys;property descriptions; zoning, deed and other land use <br /> restriction; all of which the Consulting Engineer may rely upon in performing the Consulting <br /> Engineer's services. <br />
The URL can be used to link to this page
Your browser does not support the video tag.