Laserfiche WebLink
On June 20, 2011, the City Council approved a$166,372 agreement with Homer L. Chastain <br /> &Associates, LLP for the preliminary(Phase I) design of the Franklin Street corridor portion <br /> of the City's Downtown Streetscape and Open Space Enhancement project. The ITEP grant <br /> is paying for 80%of the preliminary design costs. The preliminary engineering services <br /> agreement primarily covers the following work items: <br /> 1. Provide a topographical survey for the Franklin Street corridor. <br /> 2. Complete an environmental review of the corridor. <br /> 3. Prepare preliminary plans and estimates for the project. <br /> The preliminary design portion of the Franklin Street design is now at a point to begin the <br /> final design with the goal of a fall 2012 construction contract. <br /> Final Design (Phase II) Professional Engineering Services <br /> As with the preliminary design, the final design work on the Franklin Street corridor will <br /> utilize a portion of the funds granted to the City through the ITEP program which is overseen <br /> by IDOT. IDOT procedures require an initial, or preliminary, design be conducted that will <br /> establish the final design parameters to be followed by the final design which will complete <br /> the final plans and specifications for bidding purposes. The final design amendment <br /> proposed herein includes the following work items: <br /> 1. Investigate for sub-sidewalk vaults. <br /> 2. Review utilities within the project limits. <br /> 3. Prepare construction plans, project specifications and estimate of probable <br /> construction cost. <br /> 4. Coordinate with sub-consultants for landscaping and lighting/electrical design. <br /> 5. Provide bidding assistance. <br /> Anticipated Project Schedule <br /> Construction has resumed on the Water Street corridor and has begun on the Main Street <br /> corridor as warmer temperatures begin to prevail. Water Street and the Merchant and Prairie <br /> Street portions of the Main Street corridor are to be completed prior to the Decatur <br /> Celebration. The overall Main Street corridor project is to be completed by June of 2013. <br /> The design of the Central Park phase of the streetscape project is beginning. It is anticipated <br /> that Central Park improvements and Franklin Street Streetscape work will begin late this year <br /> and continue into 2013. The Franklin Street project will be utilizing the ITEP grant and is <br /> under the control of IDOT. <br /> POTENTIAL OBJECTION: There are no known objections to this resolution. <br /> INPUT FROM OTHER SOURCES: Development Services Department <br /> STAFF REFERENCE: Richard Marley, Public Works Director and Matt Newell, City <br /> Engineer. Richard Marley will be in attendance at the City Council meeting to answer any <br /> questions of the Council on this item. <br /> Page 12 <br />