My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
R2012-08 APPROVING THE PROPOSAL OF JAMES H. WEBSTER & ASSOCIATES, LTD
COD
>
City Clerk
>
RESOLUTIONS
>
2012
>
R2012-08 APPROVING THE PROPOSAL OF JAMES H. WEBSTER & ASSOCIATES, LTD
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2015 8:09:38 AM
Creation date
8/24/2015 8:09:37 AM
Metadata
Fields
Template:
Resolution/Ordinance
Res Ord Num
R2012-08
Res Ord Title
APPROVING THE PROPOSAL OF JAMES H. WEBSTER & ASSOCIATES, LTD. FOR APPRAISAL SERVICES TO PURCHASE RIGHT OF WAY PARCELS FOR THE REPLACEMENT OF SOUTH SHORES BRIDGE OVER SAND CREEK ARM
Department
Public Works
Approved Date
2/6/2012
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• December 6, 2010—The City Council approved Resolution 82010-232 authorizing <br /> Supplement #1 to the Agreement with URS Corporation for the preliminary design of the <br /> South Shores Bridge over the Sand Creek Arm of Lake Decatur. The supplement was to <br /> complete the preliminary design to raise the bridge by approximately 3 feet. The <br /> expenditure for the services provided in Supplement #1 was not to exceed $57,200 which <br /> brought the total cost of the preliminary design agreement to $134,700. <br /> • July 5, 2011 —Council approved Resolution R2011-106 authorizing an agreement with URS <br /> Corporation to complete the final design for the replacement of the South Shores Bridge <br /> over the Sand Creek Arm of Lake Decatur and relocation of the Sanitary District of Decatur <br /> sewer interceptor at a cost of$219,200. Resolution R2011-107 was also approved <br /> authorizing $219,200 in Motor Fuel Tax funds to pay for the design services. <br /> BACKGROUND: <br /> South Shores Bridge Replacement <br /> The South Shores-Sand Creek Bridge was originally built in 1909. A new superstructure was <br /> placed on the old abutments in 1965. The foundation and abutments are 100 years old and the <br /> super-structure is 45 years old. Routine inspections carried out by City staff and various consulting <br /> engineers since 2004 have determined that the outside beams of this bridge are deteriorating and <br /> have moved with respect to the rest of the bridge. In August 2006,the Illinois Department of <br /> Transportation (IDOT) directed the City to place a weight restriction on the bridge and to perform <br /> follow-up inspections every 6 months to monitor the outside beams of the bridge. Since the <br /> damaged beams are not in the wheel path, the bridge is safe for normal traffic; however, the 6 <br /> month inspections show that the bridge's deterioration is increasing. The bridge needs to be <br /> replaced in the near term before stricter traffic restrictions are imposed. <br /> Public input gathered as part of the design process indicated a desire to raise clearance height of the <br /> replacement bridge. The City Council supported the proposal to raise the bridge by 3 feet. <br /> $1.04 million in Federal Surface Transportation Program—Urban(STU) funding is currently <br /> allocated to fund a portion of the bridge replacement cost. Current preliminary estimates show the <br /> bridge and roadway replacement cost approaching $2.4 million and the cost to raise the Sanitary <br /> District interceptor approaches $500,000. The Sanitary District has indicated a willingness to pay <br /> for the sewer costs. It is proposed that Motor Fuel Tax funds be used to fund the remainder of the <br /> work. <br /> Right of Way Acquisition <br /> Raising the new bridge by 3 feet requires a more extensive reconstruction of the roadway <br /> approaches. The roadway work requires five parcels of right of way and 3 temporary construction <br /> easements as described below and provided on the attached drawing: <br /> • Variable width of from five to fifteen feet of additional right of way on the south side of <br /> South Shores Drive, east of the bridge affecting 65 South Shores Drive. <br /> • Fifteen feet of additional right of way on the north side of South Shores Drive, east of the <br /> bridge affecting 54, 56, 60 and 62 South Shores Drive. <br /> • Three temporary construction easements. One west of the bridge and two east of the bridge <br /> affecting 50 and 62 South Shores Drive; and 1909 Shore Oak Drive. <br /> Page 12 <br />
The URL can be used to link to this page
Your browser does not support the video tag.