Laserfiche WebLink
The Engineer shall be responsible for any damages incurred as a result of his errors, <br /> omissions and/or negligent acts and for any losses or cost to repair of remedy the construction <br /> of the storm water detention as a result of his errors, omissions and/or negligent acts. <br /> Acceptance of the work covered by the Highway Permit shall not relieve the Engineer of the <br /> responsibility for subsequent correction of any such errors, omissions and/or negligent acts of <br /> his liability for loss or damage resulting therefrom. <br /> CITY RIDER <br /> The Applicant is hereby granted permission to do such work within the city limits of Decatur as <br /> is designated in this permit. <br /> / <br /> DATED THIS ,/-!� DAY OF <br /> WITNESS SIGNED: <br /> Ma r of ca u <br /> A copy of this permit shall be in the possession of the construction foreman o th fob site for <br /> inspection by the State Highway personnel. <br /> The Applicant shall contact the Illinois Department of Transportation Operations Office in <br /> Effingham (217) 342-3951 a minimum of 48 hours in advance of starting the entrance work so <br /> a representative of this office may meet with the construction foreman to discuss the entrance <br /> construction details. <br /> 3of13 _ <br />