My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2010-04 APPROVING THE TAX INCREMENT PINES SHOPPING CENTER REDEVELOPMENT PLAN
COD
>
City Clerk
>
ORDINANCES
>
2010
>
2010-04 APPROVING THE TAX INCREMENT PINES SHOPPING CENTER REDEVELOPMENT PLAN
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/28/2015 9:41:34 AM
Creation date
8/28/2015 9:41:29 AM
Metadata
Fields
Template:
Resolution/Ordinance
Res Ord Num
2010-04
Res Ord Title
APPROVING THE TAX INCREMENT PINES SHOPPING CENTER REDEVELOPMENT PLAN
Department
Development Services
Approved Date
2/16/2010
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
64
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
co <br /> IT <br /> A7 <br /> is <br /> ai <br /> ca <br /> IV <br /> Ci (L) Lack of community planning. The proposed redevelopment project area <br /> "4 was developed prior to or without the benefit or guidance of a community plan. This <br /> 0 means that the development occurred prior to the adoption by the municipality of a <br /> Icomprehensive or other community plan or that the plan was not followed at the time of <br /> the areas development. This factor must be documented by evidence of adverse or <br /> incompatible land-use relationships, inadequate street layout, improper subdivision, <br /> 0 parcels of inadequate shape and size to meet contemporary development standards, or <br /> ,x other evidence demonstrating an absence of effective community planning. <br /> (M) The total equalized assessed value of the proposed redevelopment project <br /> area has declined for 3 of the last 5 calendar years prior to the year in which the <br /> redevelopment project area is designated or is increasing at an annual rate that is less than <br /> the balance of the municipality for 3 of the last 5 calendar years for which information is <br /> available or is increasing at an annual rate that is less than the Consumer Price Index for <br /> All Urban Consumers published by the United States Department of Labor or successor <br /> agency for 3 of the last 5 calendar years prior to the year in which the redevelopment <br /> project area is designated. <br /> (2) If vacant, the sound growth of the redevelopment project area is impaired by a <br /> combination of 2 or more of the following factors, each of which is (i) present, with that <br /> presence documented, to a meaningful extent so that a municipality may reasonably find <br /> that the factor is clearly present within the intent of the Act and (ii) reasonably distributed <br /> throughout the vacant part of the redevelopment project area to which it pertains: <br /> (A) Obsolete platting of vacant land that results in parcels of limited or narrow <br /> size or configurations of parcels of irregular size or shape that would be difficult to <br /> develop on a planned basis and in a manner compatible with contemporary standards and <br /> requirements, or platting that failed to create rights-of-ways for streets or alleys or that <br /> created inadequate right-of-way widths for streets, alleys, or other public rights-of-way or <br /> that omitted easements for public utilities. <br /> (B) Diversity of ownership of parcels of vacant land sufficient in number to <br /> retard or impede the ability to assemble the land for development. <br /> (C) Tax and special assessment delinquencies exist or the property has been <br /> the subject of tax sales under the Property Tax Code [35 ILCS 200/1 et seq.] within the <br /> last 5 years. <br /> (D) Deterioration of structures or site improvements in neighboring areas <br /> adjacent to the vacant land. <br /> (E) The area has incurred Illinois Environmental Protection Agency or United <br /> States Environmental Protection Agency remediation costs for, or a study conducted by <br /> an independent consultant recognized as having expertise in environmental remediation <br /> has determined a need for, the clean-up of hazardous waste, hazardous substances, or <br /> 9 <br />
The URL can be used to link to this page
Your browser does not support the video tag.