My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2010-04 APPROVING THE TAX INCREMENT PINES SHOPPING CENTER REDEVELOPMENT PLAN
COD
>
City Clerk
>
ORDINANCES
>
2010
>
2010-04 APPROVING THE TAX INCREMENT PINES SHOPPING CENTER REDEVELOPMENT PLAN
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/28/2015 9:41:34 AM
Creation date
8/28/2015 9:41:29 AM
Metadata
Fields
Template:
Resolution/Ordinance
Res Ord Num
2010-04
Res Ord Title
APPROVING THE TAX INCREMENT PINES SHOPPING CENTER REDEVELOPMENT PLAN
Department
Development Services
Approved Date
2/16/2010
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
64
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Cn <br /> J� <br /> Cn <br /> underground storage tanks required by State or federal law, provided that the remediation <br /> 1% costs constitute a material impediment to the development or redevelopment of the <br /> CL redevelopment project area. <br /> 1.1 <br /> (F) The total equalized assessed value of the proposed redevelopment project <br /> �t area has declined for 3 of the last 5 calendar years prior to the year in which the <br /> redevelopment project area is designated or is increasing at an annual rate that is less than <br /> the balance of the municipality for 3 of the last 5 calendar years for which information is <br /> 0 available or is increasing at an annual rate that is less than the Consumer Price Index for <br /> + All Urban Consumers published by the United States Department of Labor or successor <br /> agency for 3 of the last 5 calendar years prior to the year in which the redevelopment <br /> project area is designated. <br /> (3) If vacant, the sound growth of the redevelopment project area is impaired by one <br /> of the following factors that (i) is present, with that presence documented, to a <br /> meaningful extent so that a municipality may reasonably find that the factor is clearly <br /> present within the intent of the Act and (ii) is reasonably distributed throughout the <br /> vacant part of the redevelopment project area to which it pertains: <br /> (A) The area consists of one or more unused quarries, mines, or strip mine <br /> ponds. <br /> (B) The area consists of unused rail yards, rail tracks, or railroad rights-of- <br /> way. <br /> (C) The area, prior to its designation, is subject to (i) chronic flooding that <br /> adversely impacts on real property in the area as certified by a registered professional <br /> engineer or appropriate regulatory agency or (ii) surface water that discharges from all or <br /> a part of the area and contributes to flooding within the same watershed, but only if the <br /> redevelopment project provides for facilities or improvements to contribute to the <br /> alleviation of all or part of the flooding. <br /> (D) The area consists of an unused or illegal disposal site containing earth, <br /> stone, building debris, or similar materials that were removed from construction, <br /> demolition, excavation, or dredge sites. <br /> (E) Prior to November 1, 1999, the area is not less than 50 nor more than 100 <br /> acres and 75% of which is vacant (notwithstanding that the area has been used for <br /> commercial agricultural purposes within 5 years prior to the designation of the <br /> redevelopment project area), and the area meets at least one of the factors itemized in <br /> paragraph (1) of this subsection, the area has been designated as a town or City center by <br /> ordinance or comprehensive plan adopted prior to January 1, 1982, and the area has not <br /> been developed for that designated purpose. <br /> 10 <br />
The URL can be used to link to this page
Your browser does not support the video tag.