Laserfiche WebLink
Therefore, we are requesting city approval to install our new sign with a <br /> maximum height of 17 feet at the peak. (Please see rendering and <br /> measurements on "Proposed Sign Detail'pages. Approximate sign location is <br /> designated on the `Proposed"site plan diagram by this symbol--0.) <br /> 2. New building for The Economy Shop alon Main Street,just south of our <br /> Main Campus. Having just celebrated the 35�' anniversary, The Economy <br /> Shop is one of the oldest resale thrift stores in Decatur. The Economy Shop <br /> sells donated clothing and household goods. The proceeds from this ministry <br /> are used to help fund our Television Ministry. <br /> The Economy Shop is currently located at 965-967 North Water Street in a B-2 <br /> zone. There is no parking in front of the shop on Water Street. The only <br /> parking area is behind the shop in a small, rough, inconvenient lot accessed <br /> only by the alley. Also, because of traffic flow, many Decaturites do not even <br /> know the shop exists where it is located. <br /> We propose to construct a new building along the west side of North Main <br /> Street immediately south of King Street, south of our main campus. Primary <br /> access would be from Main Street. Parking for patrons would be in front of the <br /> building. Parking for volunteers and for dropping off donations would be in the <br /> rear. We would intend this to be an attractive building with decorative <br /> brickwork similar to our church building and probably a lighted sign on the front <br /> of the building. Measurements are yet to be determined, but we would not <br /> want it to be less than the approximately 3000 feet of the current shop. <br /> 3. Bell Tower. During demolition of our former church building, we saved the <br /> great bell from the bell tower. This is a bronze bell approximately 42 inches in <br /> diameter. We want to build some sort of open structure to house and protect <br /> the bell. This structure would become the center-piece of our front lawn area. <br /> This area is being landscaped into a "park" or garden area. The bell structure <br /> would be surrounded by a paved patio area (bricks or concrete), benches, and <br /> additional landscaping. Initial plans are being drawn, but are not yet finalized <br /> or ready to submit for approval. It is hoped the bell can be made functional <br /> again for use on special occasions. (Please see "Proposed"site plan diagram <br /> for approximate location.) <br /> 4. Improve lighting for front parking lot. We are working with local contractors <br /> on options to improve lighting in our main parking lot. In order to attract people <br /> to downtown church events, we need not only to have an attractive, welcoming <br /> campus, we also need to present a safe, secure environment. For evening <br /> events, that means ample lighting. While we currently have lighting in the <br /> parking lot, we intend to upgrade the poles and fixtures to increase light levels. <br /> 5. Main parking lot expansion. We are considering paving and striping the area <br /> at the corner of Church and Marietta of our main campus for additional <br /> parking. We may also consider paving an area along Marietta where we <br /> currently have a fenced garden. <br /> Grace United Methodist Church Petition for Rezoning from R-6 to PD Justification—Page 2 of 3 <br />