Laserfiche WebLink
t r AMENDMENT #1 <br /> Local Agency Minds Department Job Number-Construction <br /> City of Decatur Of Transportation <br /> Section Local Agency/State Job Number—Engineering/ROW <br /> 09-00933-00-BR Agreement P-97-072-10 <br /> This Agreement is made and entered into between the above local agency hereinafter referred to as"LA", and the State of Illinois, acting <br /> by and through its Department of Transportation, hereinafter referred to as"STATE". The STATE and LA jointly propose to improve the <br /> designated location as shown below. <br /> Location <br /> Local Name Brush College Subway Improvement Route FAU 7448 Length 0.9 M/L-E <br /> Termini Brush College Road between William Street and Faries Parkway <br /> Current Jurisdiction City of Decatur <br /> Proiect Description <br /> Professsional services to perform a preliminary design study to determine the most feasible option for providing adequate capacity to <br /> handle present and future traffic volumes in a safe and efficient manner for theBrush College Road crossing of the Norfolk Southern track <br /> yard south of Faries Parkway. The project will include traffic data collection and analysis, a topographic survey of the project area, <br /> stakeholder interviews and public involvement meetings, an Environmental Study for the project location and the following studies for <br /> three alternatives: Drainage Studies, Geometric Studies,Traffic Maintenance Studies,and Structure studies. Final deliverables will also <br /> include a Study Report, Project Development Report,TS&L and SGR. <br /> After public comment was received, it was found that traffic issues stemming from the NS crossing at Faries Parkway was second only to <br /> underpass safety concerns. FHWA and IDOT agreed with the City of Decatur to include the removal of this at-grade crossing at the <br /> intersection of Brush College& Faries Parkway in the preliminary design.This amendment also includes the cost for the Norfolk Southern <br /> Railroad to review and provide comments for the preliminary engineering design adjacent to the NS rail yard. <br /> Division of Cost <br /> Type of Work STATE LA Total <br /> Participating Construction 0 <br /> Non-Participating Construction 0 <br /> Preliminary Engineering 1:426,000 1,426,000 <br /> Construction Engineering 0 <br /> Right-of-Way <br /> 0 <br /> 0 <br /> 0 <br /> TOTAL $1,426,000 $ 0 $ 0 $1,426,000 <br /> Note: (1) ILLINOIS JOBS NOW funds NTE$1,426,000 <br /> (2) Balance shall be the responsibility of the local agency <br /> Payment Method (check one): <br /> ❑ Upon award of the project and request of payment from the LA,the STATE will pay the LA 100% its share of the project costs. <br /> ❑ Upon execution of the construction contract and request of payment from the LA,the STATE will pay the LA 95% of its share of the <br /> project costs. The remaining 5%will be paid to the LA upon receipt of the final invoice. <br /> ❑ The STATE will reimburse the LA for the STATE share of the project on the basis of periodic billings, provided said billings contain <br /> sufficient cost information and show evidence of payment by the LA <br /> Printed 12/13/2011 Page 1 of 3 BLR 05323(Rev. 12/02/10) <br />